Quick answers
What is this project?
Proposed specialty chemicals manufacturing facility at Additional Patalganga MIDC, Dist. Raigad, Tal. Panvel, Maharashtra by M/s. Cogent Lifescience Private Limited is a proposed industrial project in Karade Bk, Panvel, Raigarh, Maharashtra. The site covers 2.6 acres.
Who is building it?
The applicant is Cogent Life Science Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 2 Mar 2023), as of 27 Nov 2026.
Where is it?
In Karade Bk, Panvel, Raigarh, Maharashtra.
How big is it?
It has a stated cost of ₹35 crore and a site of 2.6 acres.
When was it filed?
The application was filed on 2 Mar 2023.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 2 Mar 2023 |
| Application filed | 2 Mar 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Cogent Life Science Private Limited |
| Land area | 2.6 acres (1.1 ha) |
| Project cost | ₹35 crore |
| Village / locality | Karade Bk |
| Taluk / tehsil | Panvel |
| District | Raigarh |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-02850 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 29 Oct 2026 | Under environmental review | 2.6 acres | ₹35 crore |
| Early planning filed 2 Mar 2023 (this page) | Cleared for impact study | 2.6 acres | ₹35 crore |
In context
260 applications in Raigarh since January 2022 are in the same category (Industry): 152 approved, 67 filed or under review, and 41 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2.6 acres, this one is smaller than 67% of them.
46 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Karade Bk, Panvel, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed specialty chemicals manufacturing facility at Additional Patalganga… — under environmental review, 0 m away
- No Increase in Pollution Load certification for Product Mix project located at… — initial checks, 300 m away
- Product mix Certification under NO increasing pollution load for the project… — initial checks, 300 m away
- New project for manufacturing Of Synthetic Organic Chemical located at Plot… — environmental approval granted, 600 m away
- New project for manufacturing Of Synthetic Organic Chemical located at Plot… — returned to applicant, 600 m away
- New project for manufacturing Of Synthetic Organic Chemical located at Plot… — cleared for impact study, 600 m away
- Synthetic Organic Chemicals Manufacturing facility by Kubo Combustion… — environmental approval granted, 600 m away
- Synthetic Organic Chemicals Manufacturing facility by Kubo Combustion… — cleared for impact study, 600 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.