Quick answers
What is this project?
Manufacturing of either or Combination of High Carbon Ferro Manganese (24000 TPA) OR Ferro Silicon (7750 TPA)OR Silico Manganese (15500 TPA) OR Pig Iron (24000 TPA) with installation of 2 X 6 MVA Capacity Submerged Arc Furnace by M/s Vinay Alloys is an approved industrial project in Dhurkheda, Umred, Nagpur, Maharashtra. The site covers 4.9 acres.
Who is building it?
The applicant is M/S Vinay Alloys.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 17 Aug 2023), as of 27 Nov 2026.
Where is it?
In Dhurkheda, Umred, Nagpur, Maharashtra.
How big is it?
It has a stated cost of ₹27 crore and a site of 4.9 acres.
When was it filed?
The application was filed on 28 Apr 2023.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Manufacturing of either or Combination of High Carbon Ferro Manganese (24000 TPA) OR…
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 17 Aug 2023 |
| Application filed | 28 Apr 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | M/S Vinay Alloys |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹27 crore |
| Village / locality | Dhurkheda |
| Taluk / tehsil | Umred |
| District | Nagpur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-03081 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Ownership transfer filed 2 May 2026 | Environmental approval granted | 4.9 acres | ₹27 crore |
| Ownership transfer filed 21 Dec 2024 | Withdrawn | 4.9 acres | ₹27 crore |
| New project filed 28 Apr 2023 (this page) | Environmental approval granted | 4.9 acres | ₹27 crore |
In context
79 applications in Nagpur since January 2022 are in the same category (Industry): 51 approved, 13 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 43 days from filing to approval. At 4.9 acres, this one is smaller than 77% of them.
17 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dhurkheda, Umred, Nagpur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Manufacturing of either or Combination of High Carbon Ferro Manganese (24000… — environmental approval granted, 0 m away
- Manufacturing of either or Combination of High Carbon Ferro Manganese (24000… — withdrawn, 0 m away
- Proposed Environmental Clearance for New Project with Capacity of 7134 MT/A to… — more information requested, 100 m away
- Environmental Clearance for Expansion of Project for Manufacturing Facility of… — more information requested, 1.8 km away
- Manufacturing of 6,00,000 TPA Pickled Hot Rolled (HR), Cold Rolled Hard… — environmental approval granted, 2.1 km away
- Manufacturing of 6,00,000 TPA Pickled Hot Rolled (HR), Cold Rolled Hard… — cleared for impact study, 2.1 km away
- Environmental Clearance for Basalt Stone Mining Project (Area 2.0 Ha.) by… — environmental approval granted, 3.2 km away
- Transfer of Environmental Clearance for Basalt Stone Mining Project (Area 2.0… — environmental approval granted, 3.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.