Quick answers
What is this project?
Proposed Manufacturing of 4MMTPA Cement Blending Unit and Flyash Grinding Unit at Plot No. W-7, Sector-KWC, Kalamboli, Taluka Panvel, District Raigad, Navi Mumbai, Maharashtra by M/s. Bulk Cement Corporation India Ltd is a proposed industrial project in Kalamboli, Panvel, Raigarh, Maharashtra. The site covers 29.8 acres.
Who is building it?
The applicant is Bulk Cement Corporation India Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 27 Sept 2023), as of 27 Nov 2026.
Where is it?
In Kalamboli, Panvel, Raigarh, Maharashtra.
How big is it?
It has a stated cost of ₹186 crore and a site of 29.8 acres.
When was it filed?
The application was filed on 27 Sept 2023.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 27 Sept 2023 |
| Application filed | 27 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Bulk Cement Corporation India Limited |
| Land area | 29.8 acres (12.1 ha) |
| Project cost | ₹186 crore |
| Village / locality | Kalamboli |
| Taluk / tehsil | Panvel |
| District | Raigarh |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-03131 |
In context
260 applications in Raigarh since January 2022 are in the same category (Industry): 152 approved, 67 filed or under review, and 41 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 29.8 acres, this one is larger than 85% of them.
182 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kalamboli, Panvel, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Application for EC for proposed establishment of Apex Institute and Commercial… — environmental approval granted, 250 m away
- Application for EC for establishment of Apex Institute (M-Hub) on MSSIDC's… — environmental approval granted, 250 m away
- Residential & Commercial building by M/s Thalia Investment Private Limited at… — environmental approval granted, 850 m away
- Mahatma Gandhi Mission Trust, Education and allied use Campus at Plot No. 1 &… — environmental approval granted, 950 m away
- Proposed Mahatma Gandhi Mission Trust, Education and allied use Campus at Plot… — cleared for impact study, 950 m away
- Mahatma Gandhi Mission Trust, Education and allied use Campus at Plot No. 1 &… — cleared for impact study, 950 m away
- Proposed Residential cum Commercial Buildings development at Plot No-11B,… — environmental approval granted, 1.1 km away
- The Proposed Residential cum Commercial Buildings Development located at Plot… — under environmental review, 1.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.