Quick answers
What is Khairgaon Stone & Murrum Quarry Project?
Khairgaon Stone & Murrum Quarry Project is an approved mining project in Khairgaon Bk, Kelapur, Yavatmal, Maharashtra. The site covers 5.9 acres.
Who is building it?
The applicant is Aftab Sheikh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 7 Dec 2023), as of 27 Nov 2026.
Where is it?
In Khairgaon Bk, Kelapur, Yavatmal, Maharashtra.
How big is it?
It has a stated cost of ₹69 lakh and a site of 5.9 acres.
When was it filed?
The application was filed on 7 Dec 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 7 Dec 2023 |
| Application filed | 7 Dec 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Aftab Sheikh |
| Land area | 5.9 acres (2.4 ha) |
| Project cost | ₹69 lakh |
| Village / locality | Khairgaon Bk |
| Taluk / tehsil | Kelapur |
| District | Yavatmal |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-03210 |
In context
302 applications in Yavatmal since January 2022 are in the same category (Mining): 251 approved, 19 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 5.9 acres, this one is larger than 60% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Khairgaon Bk, Kelapur, Yavatmal, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Diversion of Forest land for construction of Sanskrutik Bhavan Building at… — lapsed, 3.4 km away
- Diversion of forest Land Laying Underground OFC along the existing Right of… — forest land use approved, 6.9 km away
- Laying Optical Fiber Cable passing through the existing ROW of SH-290, SH-267… — lapsed, 10.5 km away
- Diversion of Forest Land — initial checks, 16.1 km away
- Diversion of Forest Land for Laying Underground Optical Fiber Cable Along Row… — lapsed, 17.2 km away
- 132KV Pandharkawada Mukutban TSS line — lapsed, 17.8 km away
- Earthwork of Dam, Excavation of Approach and Tail Channel, Construction of… — more information requested, 19.6 km away
- Mahadapur Minor Irrigation Project — not approved, 19.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.