Quick answers
What is this project?
Proposed Slum Rehabilitation Scheme on plot bearing C.T.S. No. 200(pt.), 214, 214/1 to 2, 215, 215/1 to 2, 216, 216/1 to 117 & 217, 217/1 to 122 Village Kanjur, at Jamil Nagar, Bhandup (W), Mumbai 400 078 by M/s. Anirdesh Developers Pvt Ltd J/V Moongipa Developments and Infrastructure Ltd is a proposed building project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The site covers 6.8 acres.
Who is building it?
The applicant is Anirdesh Developers Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 21 Sept 2023), as of 27 Nov 2026.
Where is it?
In Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra.
How big is it?
It has a stated cost of ₹781 crore and a site of 6.8 acres.
When was it filed?
The application was filed on 21 Sept 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Slum Rehabilitation Scheme on plot bearing C.T.S. No. 200(pt.), 214, 214/1 to…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 21 Sept 2023 |
| Application filed | 21 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Anirdesh Developers Private Limited |
| Land area | 6.8 acres (2.8 ha) |
| Project cost | ₹781 crore |
| Village / locality | Greater Mumbai (M Corp.) |
| Taluk / tehsil | Mumbai Suburban |
| District | Mumbai Suburban |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-03297 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 19 Oct 2023 | Environmental approval granted | 6.8 acres | ₹781 crore |
| Early planning filed 21 Sept 2023 (this page) | Cleared for impact study | 6.8 acres | ₹781 crore |
In context
1,858 applications in Mumbai Suburban since January 2022 are in the same category (Buildings & townships): 1,230 approved, 196 filed or under review, and 432 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 6.8 acres, this one is larger than 79% of them.
321 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Adani’s ₹7,514 Crore Dharavi Redevelopment: 47,076 Homes Planned in Major Mumbai Project (2.3 km away).
Other projects nearby
- Proposed Slum Rehabilitation Scheme on plot bearing C.T.S. No. 200(pt.), 214,… — environmental approval granted, 0 m away
- Proposed Slum Rehabilitation Scheme on plot bearing C.T.S. No. 200(pt.), 214,… — cleared for impact study, 0 m away
- S.R.A scheme on plot bearing C.T.S No. 35 (pt), Sai Vihar road, Village… — environmental approval granted, 450 m away
- Corrigendum in EC for redevelopment of Residential Cum Commercial Project — environmental approval granted, 600 m away
- Residential development at CTS No. 372, 372/1 to 65 of village Kanjur, L.B.S.… — environmental approval granted, 600 m away
- Residential development at CTS No. 372, 372/1 to 65 of village Kanjur, L.B.S.… — withdrawn, 600 m away
- Expansion of EC for Residential development at CTS No. 372, 372/1 to 65 of… — environmental approval granted, 600 m away
- Expansion of EC for Residential development at CTS No. 372, 372/1 to 65 of… — cleared for impact study, 600 m away
More from Anirdesh Developers Private Limited in Mumbai Suburban
- Proposed Slum Rehabilitation Scheme on plot bearing C.T.S. No. 200(pt.), 214,… — cleared for impact study
All 3 Anirdesh Developers projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.