Project details
| Official title | Proposed Expansion of Existing Grain based Distillery from 60 KLPD to 250 KLPD at Village Kadwa Mhalungi, Pade, Tal. Dindori, Dist. Nashik, Maharashtra. by M/s. Pernod Ricard India Private Limited |
|---|---|
| Status | Cleared for impact study |
| Status since | 1 Mar 2024 |
| Application filed | 7 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Pernod Ricard India Private Limited |
| Land area | 63.3 acres (25.6 ha) |
| Project cost | ₹694.5 crore |
| Village / locality | Pade |
| Taluk / tehsil | Dindori |
| District | Nashik |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-03699 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 6 Oct 2026 | Under environmental review | 63.3 acres | ₹694.5 crore |
| Early planning filed 7 Feb 2024 (this page) | Cleared for impact study | 63.3 acres | ₹694.5 crore |
In context
63 applications in Nashik since January 2022 are in the same category (Industry): 43 approved, 11 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 63.3 acres, this one is larger than 86% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pade, Dindori, Nashik, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion of Existing Grain based Distillery from 60 KLPD to 250 KLPD… — under environmental review, 0 m away
- Proposed Expansion of Existing Grain based Distillery from 60 KLPD to 250 KLPD… — returned to applicant, 0 m away
- Proposed Expansion of Active Pharmaceutical Ingredients (APIs) & Drug… — lapsed, 4.3 km away
- Proposed Expansion of Active Pharmaceutical Ingredients (APIs) & Drug… — cleared for impact study, 4.3 km away
- Obtaining Environmental Clearance for Regularization of existing TMT Bars… — cleared for impact study, 6.8 km away
- Environmental Clearance for Basalt Stone Mining Project (Area 2.50 ha) at Gut… — environmental approval granted, 6.8 km away
- Environmental Clearance for Basalt Stone Mining Project (Area 2.80 ha) at Gut… — environmental approval granted, 6.9 km away
- Environmental Clearance for Basalt Stone Quarry of Shri. Shashikant Ramnath… — withdrawn, 7 km away
More from Pernod Ricard India Private Limited in Nashik
- Proposed Expansion of Existing Grain based Distillery from 60 KLPD to 250 KLPD… — returned to applicant
3 Pernod Ricard projects in Nashik
All 6 Pernod Ricard projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.