Quick answers
What is this project?
Basalt Stone Quarry (Area 2.00 ha.) with production capacity 12,000 Brass/Annum at Gut No. 773 Part of Village- Laul, Taluka- Madha District- Solapur, Maharashtra is a lapsed mining project in Laul, Madha, Solapur, Maharashtra. The site covers 4.9 acres.
Who is building it?
The applicant is Siddheshwar Suryabhan Ubale.
Has it been approved?
No. The application was lapsed on 12 Nov 2025, so it is no longer under consideration.
Where is it?
In Laul, Madha, Solapur, Maharashtra.
How big is it?
It has a stated cost of ₹75 lakh and a site of 4.9 acres.
When was it filed?
The application was filed on 7 Nov 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 12 Nov 2025 |
| Application filed | 7 Nov 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Siddheshwar Suryabhan Ubale |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹75 lakh |
| Village / locality | Laul |
| Taluk / tehsil | Madha |
| District | Solapur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-03728 |
In context
117 applications in Solapur since January 2022 are in the same category (Mining): 86 approved, 1 filed or under review, and 30 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4.9 acres, this one is smaller than 69% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Laul, Madha, Solapur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Basalt Stone Quarry (Area 2.00 ha.) with production capacity 12,000… — environmental approval granted, 0 m away
- Common Bio Medical Waste Treatment Facility located at Plot No. A-41,… — lapsed, 13.9 km away
- Transfer of Environmental Clearance from Khandoba Distilleries Ltd. to… — environmental approval granted, 15.5 km away
- Proposed Expansion of Synthetic Resin & Lubricant Additive Manufacturing… — environmental approval granted, 15.8 km away
- Proposed Expansion of Synthetic Resin & Lubricant Additive Manufacturing… — cleared for impact study, 15.8 km away
- Expansion of Molasses based Distillery from 30 KLPD to 100 KLPD by Vitthal… — withdrawn, 17 km away
- Vitthal Corporation Ltd. (VCL) — under wildlife review, 17 km away
- Expansion of Molasses based Distillery from 30 KLPD to 100 KLPD by Vitthal… — lapsed, 17 km away
More from Siddheshwar Suryabhan Ubale in Solapur
- Basalt Stone Quarry (Area 2.00 ha.) with production capacity 12,000… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.