Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 8 Feb 2024 |
| Application filed | 30 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Kapil M. Sharma |
| Use | Mixed use |
| Units | 5,412 |
| Towers | 18 |
| Floors (tallest) | 55 |
| Height | 187 m |
| Land area | 22.7 acres (9.2 ha) |
| Built-up area | 6,10,141 m² (65,67,497 sq ft) |
| Project cost | ₹1,205 crore |
| Village / locality | Dhokali Tarf Thane |
| Taluk / tehsil | Thane |
| District | Thane |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-03732 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 12 Feb 2024 | Environmental approval granted | 22.7 acres | ₹1,205 crore |
| Early planning filed 30 Jan 2024 (this page) | Cleared for impact study | 22.7 acres | ₹1,205 crore |
What the filings say
What is planned
M/s. Siddhi Real Estate Developers proposes a residential and commercial development across two plots (Plot A and Plot B). The project includes a total of 4,751 residential flats, 351 offices, 304 shops, 6 retail shops, and 6 supermarkets. The total construction area is 6,10,141.42 square metres, with a Floor Space Index (FSI) area of 4,16,545.25 square metres.
Building Configuration
The development is divided into several high-rise structures:
Plot A:
- Building 1 (EWS): Ground floor (part) commercial and stilt, with 1st to 10th floors for residential use (35.60 metres).
- Building 2 (Wings A & B): Ground floor (part) commercial and stilt, three podium levels, and 55 residential floors (186.75 metres).
- Building 3: Ground floor commercial and stilt, 7 podium parking levels, and 21 commercial floors (113.15 metres).
Plot B:
- Building 1 (14 Wings): Includes a part basement. Wings 1 to 10 consist of ground floor commercial/stilt, two podium levels, and 40 residential floors (137.90 metres). Wings 11 to 13 have ground floor stilt, two podium levels, and 39 residential floors (134.85 metres). Wing 14 is a ground plus one-floor commercial structure (9.90 metres).
- Building 2: Ground floor stilt and 5 residential floors (17.85 metres).
Layout and design
The project includes a total of 27,726.77 square metres of recreational ground (RG). Of this, 7,156 square metres is provided on "mother earth" and 20,570.77 square metres is located on top of the podiums. The applicant plans to use the Miyawaki technique for plantation. A clubhouse area of 3,910 square metres is also planned.
Water, power and access
The total water requirement is estimated at 3,377 kilolitres per day (KLD). Fresh water will be sourced from the Thane Municipal Corporation (TMC). A Sewage Treatment Plant (STP) with a capacity of 3,300 KLD is proposed to treat 2,973 KLD of generated sewage. Recycled water will be used for flushing (1,160 KLD) and landscaping (84 KLD).
The total connected power load is 28,839 KW, with a maximum demand load of 17,437 KW. For emergency backup, three diesel generator (DG) sets are proposed with capacities of 1,010 kVA, 625 kVA, and 600 kVA. Solar photovoltaic panels are also planned to reduce fossil energy consumption.
Access to the site is provided by a 25-metre wide Development Plan (DP) road on the north, west, and south sides, and a 30-metre wide DP road on the east side. These connect to Kolshet Road and Dhokali Balkum Road.
Environmental safeguards
Solid waste generation is expected to be 13,005 kg/day. This includes 5,213 kg/day of biodegradable waste, which will be treated on-site using an Organic Waste Convertor (OWC). The resulting manure will be used for landscaping. Non-biodegradable waste (7,792 kg/day) will be sent to authorized recyclers. E-waste, estimated at 16,134 kg/year, will be handed over to Maharashtra Pollution Control Board (MPCB) authorized dealers.
Rainwater harvesting (RWH) will include a tank with a total capacity of 726 cubic metres, designed for two days of holding capacity. Stormwater will pass through a grease and desilting chamber before entering the RWH system.
| Item | Detail |
|---|---|
| Total Construction Area | 6,10,141.42 sq.m |
| FSI Area | 4,16,545.25 sq.m |
| Total Residential Units | 4,751 |
| Total Commercial Units | 667 (Offices, Shops, Supermarkets) |
| Expected Population | 28,759 |
| STP Capacity | 3,300 KLD |
| Total Solid Waste | 13,005 kg/day |
| RWH Tank Capacity | 726 cum |
Siddhi Real Estate Residential and Commercial Development at Village- Dhokali, Thane, Maharashtra site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
1,540 applications in Thane since January 2022 are in the same category (Buildings & townships): 1,001 approved, 200 filed or under review, and 339 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 22.7 acres, this one is larger than 85% of them.
333 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dhokali Tarf Thane, Thane, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Residential and Commercial Development at Village- Dhokali, Thane,… — environmental approval granted, 0 m away
- Proposed Residential and Commercial Development at Village- Dhokali, Thane by… — cleared for impact study, 0 m away
- Proposed Residential and Commercial Development at Village- Dhokali, Thane by… — cleared for impact study, 0 m away
- Proposed Residential Development for Project Affected People on Amenity Plot — environmental approval granted, 200 m away
- Residential Development with Retail Shops at plot bearing S. Nos. 39, 40/A,… — environmental approval granted, 200 m away
- Residential Development with Retail Shops at plot bearing S. Nos. 39, 40/A,… — withdrawn, 200 m away
- Residential Development with Retail Shops at plot bearing S. Nos. 39, 40/A,… — cleared for impact study, 200 m away
- Proposed Residential Development with Retail Shops at plot bearing New S. Nos.… — environmental approval granted, 200 m away
More from Kapil M. Sharma in Thane
- Application for Amendment and Expansion in EC for Residential cum Commercial… — environmental approval granted
- Application for Amendment and Expansion in EC for Residential cum Commercial… — cleared for impact study
- Proposed Residential and Commercial Development at Village- Dhokali, Thane by… — cleared for impact study
- Proposed Residential and Commercial Development at Village- Dhokali, Thane by… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.