Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 16 May 2025 |
| Application filed | 13 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Vasundhara Green Bio-Energy Private Limited |
| Land area | 19.8 acres (8 ha) |
| Project cost | ₹85 crore |
| Village / locality | Khadaki |
| Taluk / tehsil | Daund |
| District | Pune |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-03889 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 13 Jan 2024 (this page) | Environmental approval granted | 19.8 acres | ₹85 crore |
| Early planning filed 23 Nov 2023 | Cleared for impact study | 19.8 acres | ₹85 crore |
In context
121 applications in Pune since January 2022 are in the same category (Industry): 81 approved, 22 filed or under review, and 18 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 19.8 acres, this one is larger than 61% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Khadaki, Daund, Pune, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Grain Based Distillery Plant at Gat No. 1190, Khadki, Tal –Daund,… — cleared for impact study, 0 m away
- Expansion of Grain Based Distillery Plant 45 KLPD to 90 KLPD at Gat No. 1190,… — cleared for impact study, 0 m away
- Expansion of Grain Based Distillery Plant 45 KLPD to 90 KLPD at Gat No. 1190,… — withdrawn, 0 m away
- Diversion of Forest Land for construction of road from S.R. to MDR 81 to… — lapsed, 2.5 km away
- Environmental Clearance for Basalt Stone Quarry of Shri. Vikram Bapusaheb… — environmental approval granted, 4.7 km away
- Environmental Clearance for Basalt Stone Quarry of Shri. Bapusaheb Gulabrav… — lapsed, 4.7 km away
- Proposed Water Supply Pipe Line for Agriculture Purpose in Gut No.359 and 360… — lapsed, 7 km away
- Diversion of Forest Land for Laying Underground Water Pipeline for Agriculture… — lapsed, 8.2 km away
More from Vasundhara Green Bio-Energy Private Limited in Pune
- Expansion of Grain Based Distillery Plant 45 KLPD to 90 KLPD at Gat No. 1190,… — withdrawn
- Expansion of Grain Based Distillery Plant 45 KLPD to 90 KLPD at Gat No. 1190,… — cleared for impact study
All 4 Vasundhara Green Bio-Energy projects across India