Quick answers
What is this project?
Amendment/Expansion in EC for residential cum commercial project under Slum Rehabilitation Scheme on plot bearing old C.T.S No. 194 (pt), new C.T.S. No. 194A (pt) & 194B (pt) of village Ghatkopar, Mumbai by M/s. Aryaman Developers Pvt. Ltd is an approved mixed-use project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. It plans 5,818 units in 17 towers on 17.6 acres.
Who is building it?
The applicant is Aryaman Developers Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 1 Aug 2024), as of 27 Nov 2026.
Where is it?
In Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra.
How big is it?
It has a stated cost of ₹1,592.4 crore and a site of 17.6 acres.
When was it filed?
The application was filed on 16 Feb 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 1 Aug 2024 |
| Application filed | 16 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Aryaman Developers Private Limited |
| Use | Mixed use |
| Units | 5,818 |
| Towers | 17 |
| Height | 80 m |
| Parking spaces | 3,935 |
| Land area | 17.6 acres (7.1 ha) |
| Built-up area | 4,21,012 m² (45,31,731 sq ft) |
| Plot area | 71,153 m² (7,65,884 sq ft) |
| Project cost | ₹1,592.4 crore |
| Village / locality | Greater Mumbai (M Corp.) |
| Taluk / tehsil | Mumbai Suburban |
| District | Mumbai Suburban |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-03959 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 16 Feb 2024 (this page) | Environmental approval granted | 17.6 acres | ₹1,592.4 crore |
| Early planning filed 25 Oct 2023 | Cleared for impact study | 17.6 acres | ₹1,592.4 crore |
What the filings say
What is planned
M/s. Aryaman Developers Pvt. Ltd. is proposing an amendment and expansion to an existing residential cum commercial project under the Slum Rehabilitation Scheme (SRS) in Ghatkopar, Mumbai. The project is being revised to align with the Development Control and Promotion Regulations (DCPR) 2034. The applicant's project report states that the total construction area will increase from 4,21,012.11 m² to 5,26,822.66 m².
The project comprises 7 rehab buildings, 4 sale buildings, and several public utility structures. The configuration includes:
- Rehab Buildings: Seven buildings (Bldg 1 to 7) ranging from Ground + 2nd floor to Ground + 26th floor. These include a Municipal Retail Market (Bldg 1 Wing B) and two mosques (Bldg 1 Wings C & D).
- Sale Buildings: Four buildings (Bldg 10 to 13). Buildings 10 and 11 are planned as 3 Basements + Ground/Stilt + Podium + 25 floors. Building 12 includes a 26-floor residential tower and a 6-floor podium. Building 13 is planned for 26 floors.
- Public Utilities: A Fire Brigade building (Bldg 15, 12 floors), RTO Office and Housing (Bldg 18, up to 16 floors), and a BEST Bus Depot (Bldg 19, 9 floors).
- Parking: Three newly proposed parking towers (up to 70 metres in height) in addition to basement and podium parking.
The project is designed to house 5,818 residential flats, 282 shops and clinics, and 98 amenity units, catering to a total population of 27,431 people.
Layout and design
The site is located on a flat plot with a net area of 5.43 hectares (13.41 acres). The ground coverage is 28,067.96 m², representing 48.4% of the plot area. The layout includes internal roads of 12.0 metres and 18.3 metres width. A total of 2,685 four-wheeler and 1,250 two-wheeler parking spaces are planned, with 25% of these equipped with electric vehicle (EV) charging points.
Land and surroundings
The project site is situated at Village Ghatkopar, Mumbai Suburban. It is bounded by the Eastern Express Highway (60 metres wide) and various Development Plan (DP) roads. The applicant states that the land is already in their possession and was previously inhabited by slums. As of early 2024, 1,591 tenements had been demolished, with 968 remaining to be cleared.
Environmental surveys indicate the site is 3.0 km from the Thane Creek Flamingo Wildlife Sanctuary and 7.2 km from Sanjay Gandhi National Park, both outside their respective Eco-Sensitive Zones (ESZ).
Water, power and access
Water requirements are estimated at 3,500 kilolitres per day (KLD), sourced from the Municipal Corporation of Greater Mumbai (MCGM). The project will generate 3,260 KLD of sewage, to be treated by nine on-site Sewage Treatment Plants (STPs) with a combined capacity of 3,630 KLD using Moving Bed Biofilm Reactor (MBBR) technology. Approximately 41% of the treated water will be discharged into the municipal sewer, while the rest is intended for flushing, gardening, and nearby construction use.
Power will be supplied by Adani Power, with a connected load of 49.9 MW and a demand load of 14.9 MW. Energy-saving measures include solar PV panels (751 kW) providing 5% of the energy requirement, and diesel generator (DG) sets totaling 7,997.5 kVA for emergency backup.
Environmental safeguards
The project includes a total of 4,350.32 m² of required recreational green (RG) area on the ground. The applicant plans to plant 700 new trees and an additional 430 trees using the Miyawaki plantation method. Of the 26 existing trees, 17 will be retained, 6 transplanted, and 3 cut.
Solid waste management includes mechanical composting for 7,806 kg/day of wet waste and handing over 5,204 kg/day of dry waste to the local body. Rainwater harvesting will be managed through 21 tanks with a total capacity of 710 kilolitres.
Timeline
The project originally received environmental clearance in December 2011, with a subsequent amendment in April 2019. As of the latest filing, the applicant has completed 71,147.49 m² of construction. Occupation certificates have been granted for Rehab Buildings 2 and 5. Construction is underway for parts of Rehab Buildings 3 and 4, and Sale Buildings 12 and 13, while other components have not yet started.
Aryaman Developers Amendment/Expansion in EC for Residential Cum Commercial Project Under Slum Rehabilitation Scheme site plan and layout
3 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
1,858 applications in Mumbai Suburban since January 2022 are in the same category (Buildings & townships): 1,230 approved, 196 filed or under review, and 432 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 17.6 acres, this one is larger than 91% of them.
265 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Adani’s ₹7,514 Crore Dharavi Redevelopment: 47,076 Homes Planned in Major Mumbai Project (9.1 km away).
Other projects nearby
- Amendment/Expansion in EC for residential cum commercial project under Slum… — cleared for impact study, 50 m away
- Proposed Petrol Or Disel Retail Outlet at Cts No 1863, Eastern Express… — under coastal review, 350 m away
- Composite Clearance (CRZ+ EC) for Redevelopment Scheme under Reg. 33 (10) of… — recommended by coastal authority, 400 m away
- Composite Clearance (CRZ+ EC) for Redevelopment Scheme under Reg. 33 (10) of… — environmental approval granted, 400 m away
- Composite Clearance (CRZ+ EC) for Redevelopment Scheme under Reg. 33 (10) of… — cleared for impact study, 400 m away
- CRZ Clearance for Proposed Development of DP Road at C.T.S. No. 194/B, PWD… — coastal clearance granted, 400 m away
- CRZ Clearance for Proposed S. R. Scheme on land bearing CTS No. 194B(Pt) of… — lapsed, 400 m away
- Proposed redevelopment by M/s. Silver Infra Projects Private Limited — environmental approval granted, 600 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.