What is Developing? Open the mapMap

WithdrawnMining · Gadchiroli, Maharashtra

Environmental Clearance for Proposed River Bed Sand Mining Having Leases Area 2.025 Ha Deulgaon 2 Sand Ghat on Khobragadi River.

Environmental Clearance for Proposed River Bed Sand Mining Having Leases Area 2.025 Ha Deulgaon 2 Sand Ghat on Khobragadi River is a withdrawn mining project in Deulgaon, Armori, Gadchiroli, Maharashtra. The site covers 5 acres. Its stated project cost is ₹43 lakh. As of 27 Nov 2026, its status is “Withdrawn” (since 12 Sept 2024).

See it on the live map All projects in Gadchiroli

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Environmental Clearance for Proposed River Bed Sand Mining Having Leases Area 2.025 Ha Deulgaon 2 Sand Ghat on Khobragadi River is a withdrawn mining project in Deulgaon, Armori, Gadchiroli, Maharashtra. The site covers 5 acres.

Who is building it?

The applicant is District Mining Officer, Gadchiroli.

Has it been approved?

No. The application was withdrawn on 12 Sept 2024, so it is no longer under consideration.

Where is it?

In Deulgaon, Armori, Gadchiroli, Maharashtra.

How big is it?

It has a stated cost of ₹43 lakh and a site of 5 acres.

When was it filed?

The application was filed on 8 Aug 2024.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Environmental Clearance for Proposed River Bed Sand Mining Having Leases Area 2.025 Ha…

Project details

StatusWithdrawn
Status since12 Sept 2024
Application filed8 Aug 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantDistrict Mining Officer, Gadchiroli
Land area5 acres (2 ha)
Project cost₹43 lakh
Village / localityDeulgaon
Taluk / tehsilArmori
DistrictGadchiroli
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-04033

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 10 Aug 2024Environmental approval granted5 acres₹43 lakh
New project filed 8 Aug 2024 (this page)Withdrawn5 acres₹43 lakh

In context

246 applications in Gadchiroli since January 2022 are in the same category (Mining): 227 approved, 16 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 18 days from filing to approval. At 5 acres, this one is larger than 60% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 10 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 15 mining leases have applied within 5 km.

Where it is

Deulgaon, Armori, Gadchiroli, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from District Mining Officer, Gadchiroli in Gadchiroli

All 160 District Mining Officer, Gadchiroli, Maharashtra projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.