Quick answers
What is this project?
Proposed Expansion in SRA project for "Ekta SRA Co-op Housing Society (Prop)" on plot bearing C.T.S no. 1(PT.) of village: Deonar, Taluka Kurla, Dist. Mumbai-Suburban, at Ghatkopar-Mankhurd link road, Deonar, Mumbai, by M/s. Build Square is a lapsed building project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The site covers 1.1 acres.
Who is building it?
The applicant is Build Square.
Has it been approved?
No. The application was lapsed on 9 Jul 2025, so it is no longer under consideration.
Where is it?
In Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra.
How big is it?
It has a stated cost of ₹145 crore and a site of 1.1 acres.
When was it filed?
The application was filed on 20 Sept 2024.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Proposed Expansion in SRA project for "Ekta SRA Co-op Housing Society (Prop)" on plot…
Project details
| Status | Lapsed |
|---|---|
| Status since | 9 Jul 2025 |
| Application filed | 20 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Build Square |
| Land area | 1.1 acres (0.4 ha) |
| Project cost | ₹145 crore |
| Village / locality | Greater Mumbai (M Corp.) |
| Taluk / tehsil | Mumbai Suburban |
| District | Mumbai Suburban |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-04107 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 27 Feb 2025 | Lapsed | 1.1 acres | ₹145 crore |
| Expansion filed 20 Sept 2024 (this page) | Lapsed | 1.1 acres | ₹145 crore |
| Expansion filed 23 May 2024 | Lapsed | 1.1 acres | ₹145 crore |
In context
1,858 applications in Mumbai Suburban since January 2022 are in the same category (Buildings & townships): 1,230 approved, 196 filed or under review, and 432 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1.1 acres, this one is smaller than 71% of them.
210 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Adani’s ₹7,514 Crore Dharavi Redevelopment: 47,076 Homes Planned in Major Mumbai Project (9.8 km away).
Other projects nearby
- Proposed Expansion in SRA project for "Ekta SRA Co-op Housing Society (Prop)"… — lapsed, 0 m away
- Proposed Expansion in SRA project for "Ekta SRA Co-op Housing Society (Prop)"… — lapsed, 0 m away
- Expansion in proposed Residential cum Commercial project known as "Bhimwadi… — lapsed, 50 m away
- Expansion in proposed Residential cum Commercial project known as "Bhimwadi… — withdrawn, 50 m away
- Expansion in proposed Residential cum Commercial project known as "Bhimwadi… — withdrawn, 50 m away
- Proposed Residential cum Commercial Project known as Slum Rehabilitation Scheme — environmental approval granted, 50 m away
- Amendment and Expansion of Proposed slum rehabilitation of property bearing… — environmental approval granted, 50 m away
- Environmental Clearance for Proposed residential cum commercial project… — lapsed, 350 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.