Cleared for impact studyIndustry · Nandurbar, Maharashtra

Proposed expansion of existing molasses based distillery unit from 100 KLPD to 700 KLPD (expansion by 600 KLPD) by using Syrup/"B" & "C" Heavy Molasses and Sugar unit from 10,000 TCD to 15,000 TCD (expansion by 5,000 TCD)

Proposed expansion of existing molasses based distillery unit from 100 KLPD to 700 KLPD (expansion by 600 KLPD) by using Syrup/"B" & "C" Heavy Molasses and Sugar unit from 10,000 TCD to 15,000 TCD (expansion by 5,000 TCD) is a proposed industrial project in Korit, Nandurbar, Maharashtra. The site covers 161.8 acres. Its stated project cost is ₹822.9 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 16 Jun 2024).

See it on the live map All projects in Nandurbar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed expansion of existing molasses based distillery unit from 100 KLPD to 700 KLPD (expansion by 600 KLPD) by using Syrup/"B" & "C" Heavy Molasses and Sugar unit from 10,000 TCD to 15,000 TCD (expansion by 5,000 TCD) is a proposed industrial project in Korit, Nandurbar, Maharashtra. The site covers 161.8 acres.

Who is building it?

The applicant is Aayan Multitrade LLP. (Unit-1).

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 16 Jun 2024), as of 27 Nov 2026.

Where is it?

In Korit, Nandurbar, Maharashtra.

How big is it?

It has a stated cost of ₹822.9 crore and a site of 161.8 acres.

When was it filed?

The application was filed on 18 May 2024.

Project details

Official titleProposed expansion of existing molasses based distillery unit from 100 KLPD to 700 KLPD (expansion by 600 KLPD) by using Syrup/"B" & "C" Heavy Molasses and Sugar unit from 10,000 TCD to 15,000 TCD (expansion by 5,000 TCD) along with Co-generation Power Plant expansion from 35 MW to 84 MW (expansion by 49 MW) at Korit & Samsherpur village, Taluka and District Nandurbar, Maharashtra, India by Aayan Multitrade L.L.P. (Unit-1)
StatusCleared for impact study
Status since16 Jun 2024
Application filed18 May 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantAayan Multitrade LLP. (Unit-1)
Land area161.8 acres (65.5 ha)
Project cost₹822.9 crore
Village / localityKorit
Taluk / tehsilNandurbar
DistrictNandurbar
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-04229

In context

10 applications in Nandurbar since January 2022 are in the same category (Industry): 9 approved, 1 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 161.8 acres, this one is larger than 90% of them.

1 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Korit, Nandurbar, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 4 Aayan Multitrade projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.