Environmental approval grantedBuildings & townships · Aurangabad, Maharashtra

Proposed EWS Housing Scheme (PMAY) for MHADA by Chatrapati Sambhajinagar Housing & Area Development Board

Proposed EWS Housing Scheme (PMAY) for MHADA by Chatrapati Sambhajinagar Housing & Area Development Board is an approved residential project in Nakshtrawadi, Aurangabad, Maharashtra. The site covers 15.8 acres. Its stated project cost is ₹132.2 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 9 Apr 2025).

See it on the live map All projects in Aurangabad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusEnvironmental approval granted
Status since9 Apr 2025
Application filed2 Sept 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantMaharashtra Housing and Area Development Board
UseResidential
Land area15.8 acres (6.4 ha)
Project cost₹132.2 crore
Village / localityNakshtrawadi
Taluk / tehsilAurangabad
DistrictAurangabad
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-04349

What the filings say

What is planned

The Chhatrapati Sambhajinagar Housing & Area Development Board (MHADA) proposes an Economically Weaker Section (EWS) housing scheme under the Pradhan Mantri Awas Yojana (PMAY). The project is planned on a 6.4-hectare (15.81-acre) plot at Gat No. 9 in Nakshatrawadi, Aurangabad.

The development comprises 30 residential buildings, all with a configuration of Podium plus 7 floors (P+7), and one commercial building of P+5 floors. The project will provide a total of 1,770 flats, 72 shops, and 5 offices.

Building Configuration

Building NameFloorsUnitsHeight (m)
A1 to A4P+784 flats & 6 shops each23.95
A5 to A12P+784 flats each23.35
B1P+748 flats23.65
B2 to B4P+742 flats each23.35
B5 to B6P+742 flats & 6 shops each23.95
B7P+742 flats23.35
B8 to B13P+742 flats & 6 shops each23.95
B14 to B18P+742 flats each23.35
Commercial (D3)P+55 offices21.05

Layout and design

The site layout is divided into Phase 1 and Phase 2. The project includes internal RCC roads of 9.0 metres width and is bordered by 15.0-metre wide draft Development Plan (DP) roads. The design incorporates open spaces, an amenity space of 2,552.42 square metres, and dedicated areas for a Sewage Treatment Plant (STP), an Organic Waste Converter (OWC), and transformers. Parking facilities are planned for 12 cars and 1,905 scooters.

Water, power and access

During the operation phase, the total water requirement is estimated at 1,261.72 kilolitres per day (KLD). Of this, 806.9 KLD will be fresh water sourced from the Chhatrapati Sambhajinagar Municipal Corporation (CSMC). The remaining 454.82 KLD for flushing and landscaping will be met through recycled water from the onsite STP.

Power will be supplied by the Maharashtra State Electricity Distribution Company Limited (MSEDCL), with a connected load of 5,517 kW and a maximum demand of 3,684 kW. Renewable energy through solar PV installations will contribute 184 kW. For emergency backup, two diesel generator (DG) sets of 125 kVA and 30 kVA capacities are proposed.

Environmental safeguards

Waste Management

The project will generate approximately 2,727 kg/day of wet garbage, which will be treated onsite using an Organic Waste Converter. Dry garbage (1,801 kg/day) will be handed over to the local body for recycling. A 1,200 KLD STP using Moving Bed Biofilm Reactor (MBBR) technology will treat domestic sewage. The resulting STP sludge (72 kg/day) is intended for use as manure in the project's green belt.

Rainwater Harvesting and Greenery

A rainwater harvesting system is planned with 30 recharge pits (8 for rooftop runoff and 22 for surface runoff). The total green belt area is 6,484.68 square metres, where 749 native trees will be planted.

Air and Noise

During construction, 15-foot high sheets will be used for site barricading to suppress dust and noise. Water sprinkling will be conducted for dust control. DG sets will be equipped with acoustic enclosures and stacks of 29 metres height to mitigate emissions and noise impacts.

Chatrapati Sambhajinagar Housing EWS Housing Scheme PMAY for MHADA site plan and layout

A drawing from the project's filings. Sign in free to see it.

Chatrapati Sambhajinagar Housing EWS Housing Scheme PMAY for MHADA: Layout Plan: Phase 1 and 2, building blocks, roads and open spaces (preview)🔒 Sign in free to see it
Layout Plan: Phase 1 and 2, building blocks, roads and open spaces

In context

91 applications in Aurangabad since January 2022 are in the same category (Buildings & townships): 52 approved, 18 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 15.8 acres, this one is larger than 52% of them.

5 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Nakshtrawadi, Aurangabad, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.