One of 4 filings for this project. The project's main page, with every filing and where each stands: "Quillion Park" - EXPANSION OF RESIDENTIAL AND COMMERCIAL DEVELOPMENT by M/s. Viraj…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 17 May 2024 |
| Application filed | 14 May 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Viraj Estates Private Limited |
| Use | Mixed use |
| Land area | 6.3 acres (2.5 ha) |
| Built-up area | 1,68,221 m² (18,10,714 sq ft) |
| Project cost | ₹407.8 crore |
| Village / locality | Nasik |
| Taluk / tehsil | Nashik |
| District | Nashik |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-04428 |
All filings for this project
This project has 4 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 25 Jul 2026 | Environmental approval granted | 6.3 acres | ₹407.8 crore |
| Expansion filed 2 Jan 2026 | Environmental approval granted | 6.3 acres | ₹407.8 crore |
| Early planning filed 27 Nov 2025 | Cleared for impact study | 6.3 acres | ₹407.8 crore |
| Early planning filed 14 May 2024 (this page) | Cleared for impact study | 6.3 acres | ₹407.8 crore |
What the filings say
What is planned
"Quillion Park" is an expansion of a residential and commercial development by M/s. Viraj Estates Private Limited in Govind Nagar, Nashik. The project is a brownfield development on a total plot area of 2.54 hectares (6.27 acres). The applicant's project report states that the expansion increases the total construction built-up area from 1,65,791.53 m² to 1,74,966.69 m².
The development comprises residential tenements, shops, offices, and restaurants. The revised plan reduces the number of residential tenements while adding commercial facilities. The total expected population at the site is 5,612 persons, consisting of 2,492 residential and 3,119 commercial occupants.
Building Configuration
The project includes four residential wings and two commercial buildings, with heights reaching up to 102.45 metres.
| Building Name | Configuration | Height (m) | Units |
|---|---|---|---|
| Building A-01 | 2B + G + 2 Podium + 28 Floors | 99.65 | 112 Tenements |
| Building A-02 | 2B + G + 2 Podium + 28 Floors | 99.65 | 112 Tenements |
| Building B | 2B + G + 2 Podium + 28 Floors | 99.65 | 84 Tenements |
| Building C | 2B + G + 2 Podium + 29 Floors | 102.45 | 56 Tenements |
| Building D (Comm.) | 2B + G + 11 Floors | 44.95 | 80 shops, 152 offices, 7 convenient shops, 4 restaurants |
| Building E (Comm.) | G + 3 Floors | 12.85 | 33 shops |
| Club House | G + 1 Floor | 8.20 | -- |
| Vipashyana Hall | Ground Floor | 7.10 | -- |
| Yoga Hall | Ground Floor | 3.95 | -- |
Layout and design
The project layout is designed around a 30-metre wide Development Plan (DP) road. The applicant has proposed a realignment of a 12-metre wide road passing through the property to ensure smoother traffic flow, for which permission was obtained from the Nashik Municipal Corporation (NMC) in March 2020. The site is adjacent to an existing nallah (drain) that eventually joins the Nasardi River.
Parking is planned for 857 four-wheelers and 2,100 two-wheelers. The design incorporates refuge floors in the residential towers for fire safety, located at various levels in Buildings A-01, A-02, B, and C.
Land and surroundings
The site is located at Govind Nagar, Nashik, at coordinates 19°59'11.22"N and 73°46'25.93"E. It is situated approximately 1 km from the Mumbai-Agra National Highway. The surrounding area is a mix of residential and commercial developments. Environmentally sensitive locations within a 15 km radius include the Deolali Cantonment (15.06 km). The nearest water body is the Nasardi River, located 0.81 km to the east.
Water, power and access
During the operational phase, the total water requirement is estimated at 500 m³/day. Of this, 316 m³/day will be fresh water sourced from the NMC, while 167 m³/day for flushing and 17 m³/day for landscaping will be met through treated wastewater. A swimming pool will require 10 m³/day, sourced from tankers.
Sewage generation is estimated at 435 m³/day. The applicant proposes two Sewage Treatment Plants (STPs) with capacities of 325 m³/day for residential use and 150 m³/day for commercial use. Treated water will be recycled for flushing and gardening, with an excess of 283 m³/day discharged into the municipal sewer line.
The connected power load is 11,114.58 kW, with a maximum demand of 5,149.37 kW. Backup power will be provided by one 1,010 kVA diesel generator (DG) set for residential areas and one 750 kVA set for commercial areas. Solar energy systems are expected to provide 5% energy savings.
Environmental safeguards
Solid waste generation is projected at 2,006 kg/day. Biodegradable waste (962 kg/day) will be treated in an Organic Waste Converter (OWC) and used as manure. Non-biodegradable waste (1,044 kg/day) will be handed over to authorized contractors. E-waste, estimated at 8,395 kg/year, will be sent to authorized recyclers. For rainwater management, seven harvesting pits are proposed. The landscape area covers 2,427.62 m².
Timeline
The project originally received environmental clearance in July 2022 for a construction area of 1,65,791.53 m². According to the applicant's 2025 report, construction is ongoing. Building E is completed, while Buildings A-01, A-02, B, C, and D are at various stages of construction. As of the expansion filing, 1,02,022.87 m² of construction has been completed.
Viraj Estates "Quillion Park" - EXPANSION of RESIDENTIAL and COMMERCIAL DEVELOPMENT site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
93 applications in Nashik since January 2022 are in the same category (Buildings & townships): 59 approved, 12 filed or under review, and 22 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 6.3 acres, this one is larger than 60% of them.
54 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Nasik, Nashik, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Quillion Park" - EXPANSION OF RESIDENTIAL AND COMMERCIAL DEVELOPMENT by M/s.… — environmental approval granted, 0 m away
- "Quillion Park" - EXPANSION OF RESIDENTIAL AND COMMERCIAL DEVELOPMENT by M/s.… — environmental approval granted, 0 m away
- "Quillion Park" - EXPANSION OF RESIDENTIAL AND COMMERCIAL DEVELOPMENT by M/s.… — cleared for impact study, 0 m away
- Amendment & Expansion in Environmental Clearance of Proposed Residential cum… — lapsed, 100 m away
- Amendment & Expansion in Environmental Clearance of Proposed Residential cum… — withdrawn, 100 m away
- Residential cum Commercial Project (Amendment) "Star Apex" on Plot Bearing S.… — environmental approval granted, 100 m away
- Residential cum Commercial Project (Amendment) "Star Apex" on Plot Bearing S.… — withdrawn, 100 m away
- Environmental Clearance for Proposed Commercial Project at S. NO.778/2/B of… — environmental approval granted, 200 m away
All 4 Viraj Estates projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.