One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Expansion of Unsaturated Polyester Resin (USPR) Unit by "Morex Industries (Pvt)…
Project details
| Status | Withdrawn |
|---|---|
| Status since | 3 Feb 2026 |
| Application filed | 29 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Morex Industries Private Limited |
| Land area | 3,600 m² |
| Project cost | ₹7.9 crore |
| Village / locality | Hamarapur |
| Taluk / tehsil | Vada |
| District | Palghar |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-04445 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 7 Nov 2024 | Environmental approval granted | 0.9 acres | ₹7.9 crore |
| Early planning filed 29 Oct 2024 (this page) | Withdrawn | 0.9 acres | ₹7.9 crore |
In context
159 applications in Palghar since January 2022 are in the same category (Industry): 100 approved, 40 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 36 days from filing to approval. At 0.9 acres, this one is smaller than 62% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Hamarapur, Vada, Palghar, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion of Unsaturated Polyester Resin (USPR) Unit by "Morex… — environmental approval granted, 0 m away
- Proposed Manufacturing of Synthetic Organic Chemicals (Unsaturated Polyester… — under environmental review, 250 m away
- Proposed Manufacturing of Synthetic Organic Chemicals (Unsaturated Polyester… — cleared for impact study, 250 m away
- Proposed Synthetic Organic Chemicals manufacturing facility by Intexso Biochem… — cleared for impact study, 350 m away
- Proposed Synthetic Organic Chemicals manufacturing facility by Intexso Biochem… — cleared for impact study, 350 m away
- Proposed 2.4 MTPA Stainless Steel Plant (6X60 T Induction Furnace, 3X130 T… — cleared for impact study, 2.4 km away
- Regularization and Diversion of 0.11.11 ha Protected Forest Land for Existing… — lapsed, 3.6 km away
- Diversion of Private Forest restored land for constriction of farmhouse &… — lapsed, 3.8 km away
More from Morex Industries Private Limited in Palghar
- Proposed Manufacturing of Synthetic Organic Chemicals (Unsaturated Polyester… — under environmental review
- Proposed Manufacturing of Synthetic Organic Chemicals (Unsaturated Polyester… — cleared for impact study
All 4 Morex Industries projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.