What is Developing? Open the mapMap

WithdrawnBuildings & townships · Mumbai Suburban, Maharashtra

Expansion of EC for Residential development at CTS No. 372, 372/1 to 65 of village Kanjur, L.B.S. Marg at Bhandup (West), Taluka: Kurla and District: Mumbai Suburban, State: Maharashtra by M/s. Macrotech Developers Limited

Expansion of EC for Residential development at CTS No. 372, 372/1 to 65 of village Kanjur, L.B.S. Marg at Bhandup (West), Taluka: Kurla and District: Mumbai Suburban, State: Maharashtra by M/s. Macrotech Developers Limited is a withdrawn building project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The site covers 22.2 acres. Its stated project cost is ₹456.2 crore. As of 27 Nov 2026, its status is “Withdrawn” (since 11 Feb 2025).

See it on the live map All projects in Mumbai Suburban

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of EC for Residential development at CTS No. 372, 372/1 to 65 of village Kanjur, L.B.S. Marg at Bhandup (West), Taluka: Kurla and District: Mumbai Suburban, State: Maharashtra by M/s. Macrotech Developers Limited is a withdrawn building project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The site covers 22.2 acres.

Who is building it?

The applicant is Macrotech Developers Limited (Lodha).

Has it been approved?

No. The application was withdrawn on 11 Feb 2025, so it is no longer under consideration.

Where is it?

In Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra.

How big is it?

It has a stated cost of ₹456.2 crore and a site of 22.2 acres.

When was it filed?

The application was filed on 20 Sept 2024.

One of 3 filings for this project. The project's main page, with every filing and where each stands: Expansion of EC for Residential development at CTS No. 372, 372/1 to 65 of village…

Project details

StatusWithdrawn
Status since11 Feb 2025
Application filed20 Sept 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorBuildings & townships
ApplicantMacrotech Developers Limited (Lodha)
UseOther
Land area22.2 acres (9 ha)
Project cost₹456.2 crore
Village / localityGreater Mumbai (M Corp.)
Taluk / tehsilMumbai Suburban
DistrictMumbai Suburban
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-04514

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 28 Jan 2025Environmental approval granted22.2 acres₹456.2 crore
Early planning filed 21 Sept 2024Cleared for impact study22.2 acres₹456.2 crore
Early planning filed 20 Sept 2024 (this page)Withdrawn22.2 acres₹456.2 crore

In context

1,858 applications in Mumbai Suburban since January 2022 are in the same category (Buildings & townships): 1,230 approved, 196 filed or under review, and 432 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 22.2 acres, this one is larger than 93% of them.

321 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Close to Adani’s ₹7,514 Crore Dharavi Redevelopment: 47,076 Homes Planned in Major Mumbai Project (1.8 km away).

Other projects nearby

More from Macrotech Developers Limited (Lodha) in Mumbai Suburban

68 Lodha (Macrotech Developers) projects in Mumbai
All 132 Lodha (Macrotech Developers) projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.