Project details
| Status | Lapsed |
|---|---|
| Status since | 26 Mar 2025 |
| Application filed | 23 May 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Aadikaveer Constructions |
| Land area | 2 acres (0.8 ha) |
| Project cost | ₹360 crore |
| Village / locality | Pachpakhadi |
| Taluk / tehsil | Thane |
| District | Thane |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-04623 |
In context
1,540 applications in Thane since January 2022 are in the same category (Buildings & townships): 1,001 approved, 200 filed or under review, and 339 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2 acres, this one is smaller than 70% of them.
313 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pachpakhadi, Thane, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Slum Rehabilitation Scheme on Final Plot No. 70 & 72 of village… — environmental approval granted, 0 m away
- Application for EC for the proposed development Residential cum Commercial… — environmental approval granted, 100 m away
- Application for EC for proposed redevelopment of Residential cum commercial… — environmental approval granted, 200 m away
- Application for EC for proposed redevelopment of residential cum commercial… — withdrawn, 200 m away
- Application for EC for proposed redevelopment of residential cum commercial… — withdrawn, 200 m away
- Prior Environment Clearance for Proposed IT Building at Plot no. A – 208 & A –… — environmental approval granted, 350 m away
- Application for Amendment and Expansion in EC for proposed Logistics parks… — environmental approval granted, 350 m away
- Application for Amendment and Expansion in EC for proposed Logistics parks… — environmental approval granted, 350 m away
More from Aadikaveer Constructions in Thane
- Proposed Slum Rehabilitation Scheme on Final Plot No. 70 & 72 of village… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.