What is this project?
Proposed "Gateway Residencies" Residential and Commercial developmental project at R.S. No. – 345/1, 345/2, 345/3, 345/11P, 345/12P, 346, 5/8 (Part), 5/9 at Uchgaon & Sarnobatwadi, Tal -Karveer, Dist-Kolhapur by Siddhivinayak Developers Through Partner Mr. Sanjay Chandrkant Chavan is an approved mixed-use project in Kolhapur, Maharashtra. The site covers 3 acres.
Who is building it?
The applicant is Siddhivinayak developers.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 11 Jul 2025), as of 27 Nov 2026.
Where is it?
In Kolhapur, Maharashtra.
How big is it?
It has a stated cost of ₹49.2 crore and a site of 3 acres.
When was it filed?
The application was filed on 29 Oct 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 11 Jul 2025 |
| Application filed | 29 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Siddhivinayak developers |
| Use | Mixed use |
| Land area | 3 acres (1.2 ha) |
| Project cost | ₹49.2 crore |
| District | Kolhapur |
| State | Maharashtra |
| Location from | District |
| Our reference | WID-MH-04758 |
What the filings say
What is planned
Siddhivinayak Developers proposes to develop "Gateway Residencies," a residential and commercial project in Kolhapur. The project is planned on a total land area of 1.2 hectares (2.96 acres) with an estimated investment of ‣49.2 crore.
According to the master layout, the development consists of three main residential wings and an amenity building:
- A-Wing: A large central residential block.
- B-Wing: A residential block located towards the southern part of the site.
- C-Wing: A residential block located on the eastern side of the property.
- Amenity Building: A separate structure located near the entrance for community facilities.
Layout and design
The site layout features a central podium area situated between A-Wing and B-Wing. A 12.00-meter wide existing road provides access to the site, with internal circulation managed by 6.00-meter wide driveways surrounding the buildings.
A significant portion of the site is dedicated to a recreational open space located on the eastern side, adjacent to B-Wing. The layout also includes a designated area for a transformer, an Underground Tank (U.G.T.), and a Sewage Treatment Plant (STP). A nala (drain) runs along the western boundary of the property, which will be protected by an R.C.C. retaining wall.
Environmental safeguards
The applicant has outlined an Environmental Management Plan (EMP) to mitigate impacts during both construction and operational phases:
Construction Phase
- Air Quality: Dust reduction measures include road watering and periodic maintenance of construction equipment.
- Noise: Heavy construction activities will be limited to daytime hours. Noise mufflers will be used on vehicles, and workers will be provided with earplugs.
- Water and Waste: Silt fences will be installed to reduce surface run-off. Sewage from the labor camp will be treated in septic tanks. Construction debris will be recycled or reused where possible, and topsoil will be conserved for future landscaping.
Operational Phase
- Water Management: Sewage will be treated and recycled for flushing and gardening purposes. Rainwater harvesting is proposed to recharge the groundwater aquifer.
- Waste Management: The project will implement segregation of dry and wet garbage. Wet garbage is intended to be composted on-site, while dry garbage will be sent for recycling.
- Green Belt: Extensive tree plantation and landscaping are planned within the premises to act as noise barriers and improve air quality.
- Energy: Diesel Generator (DG) sets used for power backup will be housed in buildings with appropriate acoustics to minimize noise pollution.
Siddhivinayak Developers Through "Gateway Residencies" Residential and Commercial Developmental site plan and layout
A drawing from the project's filings. Sign in free to see it.
🔒 Sign in free to see itIn context
33 applications in Kolhapur since January 2022 are in the same category (Buildings & townships): 23 approved, 7 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 3 acres, this one is smaller than 67% of them.
Where it is
Kolhapur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Shri. Rajaram Pandurang Bhatale of Stone Quarry (M L Area 1.0 ha) Production… — environmental approval granted, 3.7 km away
- Environmental Clearance for stone quarry of Shri. Tanaji Ramchandra Patil &… — environmental approval granted, 5.5 km away
- Diversion of 0.165674 Ha. Forest Land for Underground Ofc Duct and Cable… — lapsed, 7 km away
- Water Supply Pipeline for Agriculture Use to Shri.Dinkar Dadaso Patil — more information requested, 8.5 km away
- Transfer of Environmental Clearance for the Sandstone Quarry Granted by the… — initial checks, 10.8 km away
- Re-Diversion of forest land for Laying Underground Optical Fiber Cable along… — more information requested, 12 km away
- Re appraisal of Environmental Clearance granted by DEIAA for the Silica Sand… — lapsed, 12.6 km away
- Diversion of Forest Land for Underground Ofc Duct and Cable Within Row of… — more information requested, 12.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.