Quick answers
What is this project?
Application for Consent to Operate of synthetic organic chemical plant located at Plot no. B-9 & B-10, Newasa MIDC, Tal.- Newasa, Dist.- Ahmednagar, Maharashtra by M/s Galaxy Lab Pvt. Ltd under product mix is a proposed industrial project in Shingve Tukai, Nevasa, Ahmadnagar, Maharashtra. The site covers 12.7 acres.
Who is building it?
The applicant is Galaxy Laboratories Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Shingve Tukai, Nevasa, Ahmadnagar, Maharashtra.
How big is it?
It has a stated cost of ₹74.4 crore and a site of 12.7 acres.
When was it filed?
The application was filed on 29 Apr 2024.
Project details
| Status | Initial checks |
|---|---|
| Status since | 29 Apr 2024 |
| Application filed | 29 Apr 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Galaxy Laboratories Private Limited |
| Land area | 12.7 acres (5.1 ha) |
| Project cost | ₹74.4 crore |
| Village / locality | Shingve Tukai |
| Taluk / tehsil | Nevasa |
| District | Ahmadnagar |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-04783 |
In context
62 applications in Ahmadnagar since January 2022 are in the same category (Industry): 36 approved, 14 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 12.7 acres, this one is smaller than 77% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Shingve Tukai, Nevasa, Ahmadnagar, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion of Synthetic Organic Chemicals manufacturing facility By… — environmental approval granted, 0 m away
- CIPM at M/s. Galaxy Laboratories Pvt. Ltd., — initial checks, 0 m away
- Re-Diversion of Forest Land for Laying Underground Optical Fiber Cable along… — under forest review, 1.1 km away
- Proposed Manufacturing of Synthetic Organic Chemicals (Surfactants & Food… — environmental approval granted, 1.5 km away
- Proposed Manufacturing of Synthetic Organic Chemicals (Surfactants & Food… — cleared for impact study, 1.5 km away
- Ahmednagar-Aurangabad Natural Gas Pipeline Project — lapsed, 5.7 km away
- Re-Diversion of Forest Land for Laying Underground Optical Fiber Cable along… — lapsed, 5.9 km away
- Smt. Supriya Laxman Gunjal — initial checks, 7.8 km away
More from Galaxy Laboratories Private Limited in Ahmadnagar
- CIPM at M/s. Galaxy Laboratories Pvt. Ltd., — initial checks
- Proposed Expansion of Synthetic Organic Chemicals manufacturing facility By… — environmental approval granted
All 3 Galaxy Laboratories projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.