Quick answers
What is this project?
Expansion and Modification of existing Project of 2.5 MTPA Grinding of Coal (under construction) and railway siding by installing DRI kilns of 2X 500 TPD for 3,30,0000 TPA of Sponge iron, 4X30 T Induction Furnace for production of 3,96,000 TPA of Billets, Rolling mill (hot rolled) for production of 3,96,000 TPA of rolled products (Bars/rods/structural/HR strips, 30 MW Power Plant (22MW WHRB+8MWAFBC) and & 2.5 MTPA Coal by M/s. Fuelco Washeries (India ) Limited is a proposed industrial project in Belsani, Chandrapur, Maharashtra. The site covers 82.2 acres.
Who is building it?
The applicant is FUELCO Washeries india limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 23 Dec 2024), as of 27 Nov 2026.
Where is it?
In Belsani, Chandrapur, Maharashtra.
How big is it?
It has a stated cost of ₹375 crore and a site of 82.2 acres.
When was it filed?
The application was filed on 16 Dec 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion and Modification of existing Project of 2.5 MTPA Grinding of Coal (under…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 23 Dec 2024 |
| Application filed | 16 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | FUELCO Washeries india limited |
| Land area | 82.2 acres (33.3 ha) |
| Project cost | ₹375 crore |
| Village / locality | Belsani |
| Taluk / tehsil | Chandrapur |
| District | Chandrapur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-05176 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 4 Jul 2025 | Environmental approval granted | 82.2 acres | ₹375 crore |
| Early planning filed 16 Dec 2024 (this page) | Cleared for impact study | 82.2 acres | ₹375 crore |
In context
55 applications in Chandrapur since January 2022 are in the same category (Industry): 38 approved, 11 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 82.2 acres, this one is smaller than 69% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Belsani, Chandrapur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion and Modification of existing Project of 2.5 MTPA Grinding of Coal… — environmental approval granted, 0 m away
- Expansion of Sponge Iron Plant from 3,24,000 TPA (4 x 100TPD & 1 x 500 TPD) to… — environmental approval granted, 4.9 km away
- Expansion of Sponge Iron Plant from 3,24,000 TPA (4 x 100TPD & 1 x 500 TPD) to… — lapsed, 4.9 km away
- Expansion of Sponge Iron Plant from 3,24,000 TPA (4 x 100TPD & 1 x 500 TPD) to… — returned to applicant, 4.9 km away
- Induction Furnace & Rolling Mill for production of Ingots, Billets 5,00,000… — more information requested, 4.9 km away
- Induction Furnace & Rolling Mill for production of Ingots, Billets 5,00,000… — environmental approval granted, 4.9 km away
- Proposed increase in the Sponge Iron production from 0.684 MTPA to 0.815 MTPA… — under environmental review, 5.2 km away
- Proposed Expansion by Installation of 4.0 MTPA Pellet Plant, 0.84 MTPA Blast… — environmental approval granted, 5.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.