Quick answers
What is this project?
Grain-Based Distillery Plant to produce Ethanol of 150 KLD with Captive Power Plant of 4.5 MW under EBP program by M/s. CPM Engineering Pvt. Ltd is a lapsed industrial project in Gadhinglaj, Kolhapur, Maharashtra. The site covers 29.7 acres.
Who is building it?
The applicant is Cpm Engineering Private Limited.
Has it been approved?
No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.
Where is it?
In Gadhinglaj, Kolhapur, Maharashtra.
How big is it?
It has a stated cost of ₹154.4 crore and a site of 29.7 acres.
When was it filed?
The application was filed on 30 Mar 2024.
Project details
| Official title | Proposed establishment of Grain-Based Distillery Plant to produce Ethanol of 150 KLD with Captive Power Plant of 4.5 MW under EBP program by M/s. CPM Engineering Pvt. Ltd., |
|---|---|
| Status | Lapsed |
| Status since | 29 Oct 2024 |
| Application filed | 30 Mar 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Cpm Engineering Private Limited |
| Land area | 29.7 acres (12 ha) |
| Project cost | ₹154.4 crore |
| Village / locality | Gadhinglaj |
| Taluk / tehsil | Gadhinglaj |
| District | Kolhapur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-05242 |
In context
43 applications in Kolhapur since January 2022 are in the same category (Industry): 33 approved, 5 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 29.7 acres, this one is smaller than 67% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gadhinglaj, Kolhapur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Re appraisal of Environmental Clearance granted by DEIAA for the Basalt Stone… — lapsed, 4.4 km away
- Expansion of Distillery Capacity From 25 Klpd to 200 Klpd Based on Sugarcane… — environmental approval granted, 9.7 km away
- Expansion of Distillery Capacity From 25 Klpd to 200 Klpd Based on Sugarcane… — cleared for impact study, 9.7 km away
- Environmental Clearance for the Basalt stone Quarry of Shri. Shubham Vasantrao… — environmental approval granted, 10 km away
- Environmental Clearance for the Basalt Stone Quarry of Shri. Subham Vasantrao… — withdrawn, 10 km away
- Re Appraisal of Environmental Clearance Granted by Deiaa for the Basalt Stone… — lapsed, 11.5 km away
- 60 Students Government Yoga & Naturopathy College & 60 bedded Hospital at… — environmental approval granted, 11.8 km away
- Environmental Clearance for the stone quarry of shri. Pandurang Rama kurunkar,… — environmental approval granted, 11.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.