One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Expansion of Induction Furnace from 40,000 TPA to 60,000 TPA & Production of…
Project details
| Status | Lapsed |
|---|---|
| Status since | 28 Oct 2025 |
| Application filed | 14 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Shiv Krupa Steel& Alloys Private Limited |
| Land area | 3.7 acres (1.5 ha) |
| Project cost | ₹24.2 crore |
| Village / locality | Tornae |
| Taluk / tehsil | Vada |
| District | Palghar |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-05382 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 14 Aug 2024 (this page) | Lapsed | 3.7 acres | ₹24.2 crore |
| New project filed 29 May 2023 | More information requested | 3.7 acres | ₹24.2 crore |
In context
159 applications in Palghar since January 2022 are in the same category (Industry): 100 approved, 40 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 36 days from filing to approval. At 3.7 acres, this one is larger than 74% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Tornae, Vada, Palghar, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion of Induction Furnace from 40,000 TPA to 60,000 TPA &… — more information requested, 0 m away
- Environmental Clearance for Proposed Basalt Stone Quarry having area 4.3910 Ha… — lapsed, 1.4 km away
- Proposed Expansion of Synthetic Organic Chemicals (Resins and Polymers)… — lapsed, 3 km away
- Proposed Manufacturing of M.S. Billets & Structural Steel by M/s. DEEVIN… — more information requested, 5 km away
- Proposed Manufacturing of M.S. Billets & Structural Steel by M/s. DEEVIN… — under environmental review, 5 km away
- New Pipe water supply scheme at Pimparoli Tal-Wada — lapsed, 6.3 km away
- "Common Bio-Medical Waste Treatment Facility" (CBWTF) by M/s Atharv… — under environmental review, 6.3 km away
- Expansion of Synthetic Organic Chemicals Manufacturing Unit From Existing 700… — environmental approval granted, 7.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.