Quick answers
What is this project?
Proposed new project for manufacturing of Synthetic Organic Chemicals at Plot Nos. A-18, MIDC Patalganga, Khalapur, Dist. Raigad, Maharashtra by M/s. Clearsynth labs ltd is a proposed industrial project in Kaire, Khalapur, Raigarh, Maharashtra. The site covers 1 acre.
Who is building it?
The applicant is Clearsynth Labs Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 29 Jun 2024), as of 27 Nov 2026.
Where is it?
In Kaire, Khalapur, Raigarh, Maharashtra.
How big is it?
It has a stated cost of ₹40 crore and a site of 1 acre.
When was it filed?
The application was filed on 26 Jun 2024.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Proposed new project for manufacturing of Synthetic Organic Chemicals at Plot Nos. A-18,…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 29 Jun 2024 |
| Application filed | 26 Jun 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Clearsynth Labs Limited |
| Land area | 1 acres (0.4 ha) |
| Project cost | ₹40 crore |
| Village / locality | Kaire |
| Taluk / tehsil | Khalapur |
| District | Raigarh |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-05454 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 6 Dec 2025 | Environmental approval granted | 1 acre | ₹40 crore |
| New project filed 27 Jun 2025 | Returned to applicant | 1 acre | ₹40 crore |
| Early planning filed 26 Jun 2024 (this page) | Cleared for impact study | 1 acre | ₹40 crore |
In context
260 applications in Raigarh since January 2022 are in the same category (Industry): 152 approved, 67 filed or under review, and 41 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1 acre, this one is smaller than 84% of them.
48 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kaire, Khalapur, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed new project for manufacturing of Synthetic Organic Chemicals at Plot… — environmental approval granted, 0 m away
- Proposed new project for manufacturing of Synthetic Organic Chemicals at Plot… — returned to applicant, 0 m away
- Proposed Expansion under Product Mix - No Increase in Pollution Load For… — initial checks, 100 m away
- Increase in production capacity — initial checks, 500 m away
- Increase in production capacity — initial checks, 500 m away
- Proposed expansion project for manufacturing imaging chemicals of capacity 134… — initial checks, 600 m away
- Proposed expansion project for manufacturing imaging chemicals of capacity 134… — environmental approval granted, 600 m away
- Proposed expansion project for manufacturing imaging chemicals of capacity 134… — returned to applicant, 600 m away
All 3 Clearsynth Labs projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.