Quick answers
What is this project?
Proposed Data Centre and Residential Development With Retail and Commercial Components at Land Bearing Survey No/Gut No 39,42,49 Village Bhokarpada, Tal- Panvel, Dist- Raigad by Larsen & Toubro LTD is an approved mixed-use project in Bhokarpada, Panvel, Raigarh, Maharashtra. It plans 13 towers of up to 36 floors on 33.1 acres.
Who is building it?
The applicant is Larsen Toubro LTD.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 23 Dec 2025), as of 27 Nov 2026.
Where is it?
In Bhokarpada, Panvel, Raigarh, Maharashtra.
How big is it?
It has a stated cost of ₹2,222 crore and a site of 33.1 acres.
When was it filed?
The application was filed on 30 Jan 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 23 Dec 2025 |
| Application filed | 30 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Larsen Toubro LTD |
| Use | Mixed use |
| Towers | 13 |
| Floors (tallest) | 36 |
| Basements | 1 |
| Height | 119 m |
| Land area | 33.1 acres (13.4 ha) |
| Built-up area | 2,03,525 m² (21,90,723 sq ft) |
| Plot area | 1,34,100 m² (14,43,439 sq ft) |
| Project cost | ₹2,222 crore |
| Village / locality | Bhokarpada |
| Taluk / tehsil | Panvel |
| District | Raigarh |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-05465 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 30 Jan 2025 (this page) | Environmental approval granted | 33.1 acres | ₹2,222 crore |
| Early planning filed 22 Aug 2024 | Cleared for impact study | 33.1 acres | ₹2,222 crore |
In context
674 applications in Raigarh since January 2022 are in the same category (Buildings & townships): 403 approved, 85 filed or under review, and 186 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 33.1 acres, this one is larger than 86% of them.
51 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhokarpada, Panvel, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Data Centre and Residential Development With Retail and Commercial… — cleared for impact study, 0 m away
- Proposed Data Centre and Residential Development With Retail and Commercial… — withdrawn, 0 m away
- Amendment & Expansion in EC for Residential cum Commercial project on plot… — more information requested, 450 m away
- Application for Amendment/Expansion in EC for Proposed Mixed Use Development… — cleared for impact study, 1.9 km away
- Application for Amendment/Expansion in EC for Proposed Mixed Use Development… — environmental approval granted, 1.9 km away
- Application for Amendment/Expansion in EC for Proposed Mixed Use Development… — environmental approval granted, 1.9 km away
- Application for Amendment/Expansion in EC for Proposed Mixed Use Development… — cleared for impact study, 1.9 km away
- "mass Dream City" – Proposed Residential Development on S. No. 165 / 2a/2,… — environmental approval granted, 2.2 km away
All 15 Larsen Toubro projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.