Initial checksIndustry · Kolhapur, Maharashtra

Increase the Production Capacity of Distillery Plant from 95 KLPD to 142 KLPD by addition of raw materials (B Heavy Molasses & Sugarcane Syrup) in the existing Distillery Plant

Increase the Production Capacity of Distillery Plant from 95 KLPD to 142 KLPD by addition of raw materials (B Heavy Molasses & Sugarcane Syrup) in the existing Distillery Plant is a proposed industrial project in Belewadi Kalamma, Kagal, Kolhapur, Maharashtra. The site covers 93.2 acres. Its stated project cost is ₹206.8 crore. As of 27 Nov 2026, its status is “Initial checks” (since 29 Aug 2024).

See it on the live map All projects in Kolhapur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Increase the Production Capacity of Distillery Plant from 95 KLPD to 142 KLPD by addition of raw materials (B Heavy Molasses & Sugarcane Syrup) in the existing Distillery Plant is a proposed industrial project in Belewadi Kalamma, Kagal, Kolhapur, Maharashtra. The site covers 93.2 acres.

Who is building it?

The applicant is Sar Senapati Santaji Ghorpade Sugar Factory Limited.

Has it been approved?

Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.

Where is it?

In Belewadi Kalamma, Kagal, Kolhapur, Maharashtra.

How big is it?

It has a stated cost of ₹206.8 crore and a site of 93.2 acres.

When was it filed?

The application was filed on 29 Aug 2024.

Project details

StatusInitial checks
Status since29 Aug 2024
Application filed29 Aug 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorIndustry
ApplicantSar Senapati Santaji Ghorpade Sugar Factory Limited
Land area93.2 acres (37.7 ha)
Project cost₹206.8 crore
Village / localityBelewadi Kalamma
Taluk / tehsilKagal
DistrictKolhapur
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-05479

In context

43 applications in Kolhapur since January 2022 are in the same category (Industry): 33 approved, 5 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 93.2 acres, this one is smaller than 56% of them.

7 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Belewadi Kalamma, Kagal, Kolhapur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.