Project details
| Official title | "Pradhan Mantri Awas Yojana (PMAY) Housing Scheme", At Village: Titwala, Tal-Kalyan, Dist- Thane, Maharashtra. |
|---|---|
| Status | Environmental approval granted |
| Status since | 3 Jan 2025 |
| Application filed | 12 Jun 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Rustagi Estates PVT LTD |
| Use | Residential |
| Land area | 6.2 acres (2.5 ha) |
| Built-up area | 44,648 m² (4,80,587 sq ft) |
| Project cost | ₹125 crore |
| Village / locality | Kalyan Dombivali Muncipal Corporation |
| Taluk / tehsil | Kalyan |
| District | Thane |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-05509 |
What the filings say
What is planned
Rustagi Estates Pvt Ltd is expanding a housing scheme under the Pradhan Mantri Awas Yojana (PMAY) at Titwala. The project is situated on a total plot area of 25,100 square metres. According to the applicant's conceptual plan, the expansion involves changes to Building 1, the addition of a new Building 6, and increasing the floor counts of several other buildings. This has raised the total construction built-up area to 44,647.84 square metres.
The project is designed for the Economically Weaker Section (EWS) and differently-abled citizens. It comprises six residential buildings, an amenity building, and a club house. The residential component will provide a total of 691 flats and several shops. The applicant estimates a total occupancy of 3,586 persons, including a floating population.
| Item | Detail |
|---|---|
| Total Plot Area | 25,100.00 Sq.mt. |
| Total Construction Built-up Area | 44,647.84 Sq.mt. |
| FSI Area | 38,596.08 Sq.mt. |
| Non-FSI Area | 6,051.76 Sq.mt. |
| Recreational Ground (RG) Area | 2,771.86 Sq.mt. |
| Total Flats | 691 nos. |
| Total Occupancy | 3,586 persons |
| 4-Wheeler Parking | 161 spaces |
| 2-Wheeler Parking | 692 spaces |
Building Configuration
- Building 1: Ground + 2 floors + 3 (part) floors
- Building 2: Stilt + 12 floors
- Building 3 (Wings A & B): Stilt + 10 floors
- Building 4: Stilt + 13 floors
- Building 5 (Wings A & B): Stilt + 12 floors
- Building 6: Ground + 3 floors
- Amenity Building: Ground floor (sanitary blocks for servants and drivers)
- Club House: Ground + 1 floor
Layout and design
The site is surrounded by open land on all sides. The layout includes internal roads ranging from 6.00 metres to 12.00 metres in width. The project is connected to a proposed 24-metre wide Development Plan (DP) road. Design features include safety convex mirrors for blind corners, speed bumps, and directional signage. The applicant has committed to providing electric vehicle (EV) charging ports in at least 30% of the total parking area.
Water, power and access
The total water requirement during the operational phase is estimated at 388 to 396 kilolitres per day (KLD). Fresh water of 255 KLD will be sourced from the Kalyan Dombivali Municipal Corporation (KDMC) for domestic use. Recycled water from the on-site sewage treatment plant (STP) will provide 133 KLD for flushing and 8 KLD for gardening.
The connected electrical load is 3,571 KW, with a maximum demand of 2,380 KW to be supplied by the Maharashtra State Electricity Distribution Company Limited (MSEDCL). For emergency backup, three diesel generator (DG) sets of 125 kVA capacity each are proposed.
Environmental safeguards
A Moving Bed Bio Reactor (MBBR) based STP with a capacity of 420 KLD will be installed. The applicant plans to recycle approximately 60% of treated sewage for secondary purposes. Until a municipal sewer line is completed, excess treated sewage will be provided to tanker suppliers for nearby construction activities.
Solid waste generation is estimated at 1,327 kg per day, consisting of 531 kg of biodegradable and 796 kg of non-biodegradable waste. Biodegradable waste will be treated in on-site Organic Waste Converters (OWCs), and the resulting manure will be used for landscaping. For rainwater harvesting, 10 tanks with a total capacity of 260 KL are planned. Energy-saving measures include LED lighting, solar PV panels, and high-efficiency motors, aiming for a 5% saving through solar energy.
Timeline
Part of the construction has already been completed on-site under an earlier environmental clearance dated 9 January 2023. The applicant states that the remaining construction work will be carried out in a single phase and is expected to be completed within approximately five years.
Pradhan Mantri Awas Yojana (PMAY) Housing Scheme site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
1,540 applications in Thane since January 2022 are in the same category (Buildings & townships): 1,001 approved, 200 filed or under review, and 339 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 6.2 acres, this one is larger than 58% of them.
20 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kalyan Dombivali Muncipal Corporation, Kalyan, Thane, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Pradhan Mantri Awas Yojana on plot bearing Survey no. 98/4/A/2, 98/4/C/1,… — environmental approval granted, 450 m away
- Proposed Pradhan Mantri Awas Yojana on plot bearing Survey no. 98/4/A/2,… — environmental approval granted, 450 m away
- Proposed Expansion in Affordable Housing Project (EWS Housing — environmental approval granted, 550 m away
- Affordable Housing Project - JV under PMAY on Private land bearing S. No 42/1… — lapsed, 600 m away
- Application for EC Clearance for the proposed Residential Cum Commercial… — environmental approval granted, 650 m away
- Proposed PMAY Scheme — environmental approval granted, 800 m away
- Proposed Building Construction Project on S.No.12/1, 12/ 4, 220, 221/3/2P,… — lapsed, 1 km away
- Expansion in Environment Clearance for "Vedant Millennia" Proposed Residential… — environmental approval granted, 1.1 km away
More from Rustagi Estates PVT LTD in Thane
- Pradhan Mantri Awas Yojana on plot bearing Survey no. 98/4/A/2, 98/4/C/1,… — environmental approval granted
- Proposed Pradhan Mantri Awas Yojana on plot bearing Survey no. 98/4/A/2,… — environmental approval granted
All 4 Rustagi Estates projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.