One of 5 filings for this project. The project's main page, with every filing and where each stands: Environmental clearance for Expansion in "Residential Project" at F. P. No. 1211 of…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 13 Nov 2024 |
| Application filed | 18 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Twenty Five South Realty Limited |
| Use | Residential |
| Land area | 5.3 acres (2.2 ha) |
| Built-up area | 2,23,655 m² (24,07,400 sq ft) |
| Project cost | ₹1,930 crore |
| Village / locality | Greater Mumbai (M Corp.) |
| Taluk / tehsil | Greater Mumbai |
| District | Mumbai |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-05638 |
All filings for this project
This project has 5 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 4 Aug 2025 | Environmental approval granted | 5.3 acres | ₹1,930 crore |
| Early planning filed 14 Jul 2025 | Cleared for impact study | 5.3 acres | ₹1,930 crore |
| Early planning filed 20 May 2025 | Cleared for impact study | 5.3 acres | ₹1,930 crore |
| Expansion filed 19 Feb 2025 | Withdrawn | 5.3 acres | ₹1,930 crore |
| Early planning filed 18 Oct 2024 (this page) | Cleared for impact study | 5.3 acres | ₹1,930 crore |
In context
583 applications in Mumbai since January 2022 are in the same category (Buildings & townships): 446 approved, 58 filed or under review, and 79 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 5.3 acres, this one is larger than 68% of them.
419 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Greater Mumbai (M Corp.), Greater Mumbai, Mumbai, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental clearance for Expansion in "Residential Project" at F. P. No.… — environmental approval granted, 0 m away
- Environmental clearance for Expansion in "Residential Project" at F. P. No.… — cleared for impact study, 0 m away
- Environmental clearance for Expansion in "Residential Project" at F. P. No.… — cleared for impact study, 0 m away
- Environmental clearance for Expansion in "Residential Project" at F. P. No.… — withdrawn, 0 m away
- Application for CRZ Clearance for proposed Redevelopment of the Project site… — recommended by coastal authority, 100 m away
- Proposed Redevelopment on plot bearing F.P.No. 1198, 1199 and 1200 of TPS IV,… — more information requested, 150 m away
- Proposal Redevelopment under DCPR 33(19) for the Properties bearing for F.P.… — environmental approval granted, 250 m away
- Environment Clearance for Amendment/Expansion in redevelopment of Residential… — environmental approval granted, 350 m away
All 5 Twenty Five South Realty projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.