Quick answers
What is this project?
Proposed expansion of Residential Building "Shiv Parvati C.H.S.L" on Plot No. B, RSC-54, MHADA Layout Charkop Part -IV, C.T.S. No. 1C/1 (part) of Village, Kandivali (W), Mumbai is a withdrawn building project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The site covers 1.4 acres.
Who is building it?
The applicant is Shiv Parvati Co Op Hsg Limited.
Has it been approved?
No. The application was withdrawn on 11 Feb 2025, so it is no longer under consideration.
Where is it?
In Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra.
How big is it?
It has a stated cost of ₹201.5 crore and a site of 1.4 acres.
When was it filed?
The application was filed on 19 Sept 2024.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Proposed expansion of Residential Building "Shiv Parvati C.H.S.L" on Plot No. B, RSC -…
Project details
| Status | Withdrawn |
|---|---|
| Status since | 11 Feb 2025 |
| Application filed | 19 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Shiv Parvati Co Op Hsg Limited |
| Use | Other |
| Land area | 1.4 acres (0.6 ha) |
| Project cost | ₹201.5 crore |
| Village / locality | Greater Mumbai (M Corp.) |
| Taluk / tehsil | Mumbai Suburban |
| District | Mumbai Suburban |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-05754 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 6 Aug 2025 | Environmental approval granted | 1.4 acres | ₹201.5 crore |
| Expansion filed 23 Apr 2025 | Withdrawn | 1.4 acres | ₹201.5 crore |
| Expansion filed 19 Sept 2024 (this page) | Withdrawn | 1.4 acres | ₹201.5 crore |
What the filings say
What is planned
Shiv Parvati Co-operative Housing Society Limited (C.H.S.L) is expanding a residential building project on a 0.55-hectare (1.36-acre) plot in the Charkop area of Kandivali (West). The project is a Maharashtra Housing and Area Development Authority (MHADA) development.
The expansion plans include four residential wings, designated as Tower-A, Tower-B, Tower-C, and Tower-D. According to the block plan, these buildings are designed with a stilt level, a first podium, and 21 upper floors. The total construction built-up area (BUA) is 35,561.02 square metres, which includes 23,693.20 square metres of Floor Space Index (FSI) area and 11,867.82 square metres of non-FSI area.
As of late 2018, the applicant reported that 9,611.92 square metres of construction had already been initiated, consisting of 6,161.05 square metres of FSI area and 3,450.87 square metres of non-FSI area.
Project Components
| Item | Detail |
|---|---|
| Total Plot Area | 5,507 square metres |
| Net Plot Area | 5,464.77 square metres |
| Ground Coverage | 3,024.74 square metres (55.35%) |
| Total BUA | 35,561.02 square metres |
| Residential Wings | 4 (Towers A, B, C, and D) |
| Building Height | Stilt + 1st Podium + 21 Floors |
| Estimated Cost | ₹201.49 crore (latest filing) |
Layout and Design
The project layout is linear, fronting a 9.15-metre wide access road (RSC-54). The four residential wings are arranged along an internal driveway. The site includes several specialized facilities:
- A fitness centre and a swimming pool located at one end of the plot.
- Two parking towers situated between the residential wings.
- A substation on the ground level.
- Underground tanks for domestic water, flushing, and firefighting.
- An Organic Waste Converter (OWC) and Sewage Treatment Plants (STP) located below ground.
Water, Power and Access
The total water requirement for the project is estimated at 211 kilolitres per day (KLD) during the dry season and 210 KLD during the wet season. Fresh water, sourced from the Municipal Corporation of Greater Mumbai (MCGM), accounts for 140 KLD. The remaining demand is met through recycled water for flushing (70 KLD) and gardening (1 KLD).
Power will be supplied by Reliance Energy or TATA Power. The connected load for the operation phase is 2,276 KW, with a demand load of 1,436 KW. For emergency backup, the project includes one 320 KVA diesel generator set for the operation phase and two 150 KVA sets for the construction phase.
Energy-saving measures include:
- Solar PV panels for lobby and staircase lighting.
- Solar hot water systems.
- LED exterior lighting and solar-powered light poles for 60% of the lighting.
- Regenerative type lifts and T5 lights in parking areas.
Environmental Safeguards
The applicant has proposed several systems to manage waste and emissions:
- Sewage Treatment: Two STP units using Moving Bed Biofilm Reactor (MBBR) technology with a combined capacity of 220 KLD (110 KLD each). Treated water will be recycled for secondary purposes like flushing and gardening.
- Solid Waste: The project will generate approximately 468 kg/day of wet waste and 312 kg/day of dry waste. Wet waste will be processed in an on-site Organic Waste Converter to produce manure for landscaping.
- Rainwater Harvesting: Four rainwater harvesting tanks, each with a capacity of 23 cubic metres per wing, are planned at the ground level.
- Air Quality: DG sets will be equipped with acoustic enclosures and stacks of appropriate height to control noise and emissions. Dust mitigation measures, such as site barricading, will be implemented during construction.
Expansion of Residential Building Shiv Parvati C.H.S.L site plan and layout
2 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
1,858 applications in Mumbai Suburban since January 2022 are in the same category (Buildings & townships): 1,230 approved, 196 filed or under review, and 432 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1.4 acres, this one is smaller than 60% of them.
481 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Adani’s ₹7,514 Crore Dharavi Redevelopment: 47,076 Homes Planned in Major Mumbai Project (14.1 km away).
Other projects nearby
- Proposed expansion of Residential Building "Shiv Parvati C.H.S.L" on Plot No.… — environmental approval granted, 0 m away
- Proposed expansion of Residential Building "Shiv Parvati C.H.S.L" on Plot No.… — withdrawn, 0 m away
- Proposed joint redevelopment of existing building no 142 &144 on plot bearing… — withdrawn, 300 m away
- Proposed scheme under 33(5) of MCGM DCPR for Joint Redevelopment of Existing… — environmental approval granted, 300 m away
- Proposed Slum Rehabilitation scheme ' Shravan Nagar' on Property Bearing… — lapsed, 350 m away
- Proposed Slum Rehabilitation scheme ' Shravan Nagar' on Property Bearing… — environmental approval granted, 350 m away
- Proposed Slum Rehabilitation scheme 'Shravan Nagar' on Property Bearing C.T.S.… — withdrawn, 350 m away
- Proposed Slum Rehabilitation scheme 'Shravan Nagar' on Property Bearing C.T.S.… — withdrawn, 350 m away
All 3 Shiv Parvati Co Op Hsg projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.