Project details
| Official title | Proposed expansion of existing Molasses based distillery unit from 30 KLPD to 140 KLPD using Syrup & Molasses along with establishment of proposed 5.4 MW Co-generation Power Plant for distillery unit (Existing 8 MW TG set at Sugar Unit), while increasing the existing Sugarcane crushing capacity from 2500 TCD to 5000 TCD at Talewadi and Gadhi village, Taluka Georai, District Beed, Maharashtra by M/s. Jai Bhavani Sahakari Sakhar Karkhana Limited. |
|---|---|
| Status | Returned to applicant |
| Status since | 25 Apr 2025 |
| Application filed | 24 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Jaibhawani Sahakari Sakhar Karkhana Limited |
| Land area | 153.1 acres (62 ha) |
| Project cost | ₹211.1 crore |
| Village / locality | Talewadi |
| Taluk / tehsil | Georai |
| District | Bid |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-05787 |
In context
17 applications in Bid since January 2022 are in the same category (Industry): 10 approved, 6 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 153.1 acres, this one is larger than 82% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Talewadi, Georai, Bid, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed expansion of existing Molasses based distillery unit from 30 KLPD to… — cleared for impact study, 0 m away
- Environmental Clearance for the Basalt Stone Quarry having area 1.00 Ha of… — environmental approval granted, 900 m away
- Environment Clearance for Basalt Stone Quarry of having area 1.00 Ha of Shri.… — environmental approval granted, 950 m away
- Environmental Clearance for the Basalt Stone Quarry of Shri. Shriram Prabhurao… — environmental approval granted, 4.7 km away
- Mr. Sukhdeo Namdeo Zirpe — environmental approval granted, 6.4 km away
- Environment clearance for the Basalt stone quarry of Shri. Bipin Kalyanrao… — environmental approval granted, 6.9 km away
- Stone Quarry (1.0 ha)Gut No. 268 Part of Village-Madalmohi, Taluka-Georai,… — environmental approval granted, 8.4 km away
- Environmental Clearance for Basalt Stone Quarry having area 1.00 Ha of Shri.… — environmental approval granted, 14.8 km away
More from Jaibhawani Sahakari Sakhar Karkhana Limited in Bid
- Proposed expansion of existing Molasses based distillery unit from 30 KLPD to… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.