Quick answers
What is this project?
Residential and commercial development along with PTC component at Village: Vikhroli, Taluka: Kurla, District: Mumbai Suburban, State: Maharashtra, India by M/s. Macrotech Developers Limited is a proposed mixed-use project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The site covers 8.5 acres.
Who is building it?
The applicant is Macrotech Developers Limited (Lodha).
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 18 Oct 2024), as of 27 Nov 2026.
Where is it?
In Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra.
How big is it?
It has a stated cost of ₹743.5 crore and a site of 8.5 acres.
When was it filed?
The application was filed on 8 Oct 2024.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 18 Oct 2024 |
| Application filed | 8 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Macrotech Developers Limited (Lodha) |
| Use | Mixed use |
| Land area | 8.5 acres (3.5 ha) |
| Built-up area | 2,90,826 m² (31,30,422 sq ft) |
| Project cost | ₹743.5 crore |
| Village / locality | Greater Mumbai (M Corp.) |
| Taluk / tehsil | Mumbai Suburban |
| District | Mumbai Suburban |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-05830 |
All filings for this project
This project has 4 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 27 Feb 2025 | Withdrawn | 8.5 acres | ₹743.5 crore |
| Expansion filed 10 Feb 2025 | Withdrawn | 8.5 acres | ₹743.5 crore |
| Early planning filed 8 Oct 2024 (this page) | Cleared for impact study | 8.5 acres | ₹743.5 crore |
| Early planning filed 1 Oct 2024 | Withdrawn | 8.5 acres | ₹743.5 crore |
In context
1,858 applications in Mumbai Suburban since January 2022 are in the same category (Buildings & townships): 1,230 approved, 196 filed or under review, and 432 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 8.5 acres, this one is larger than 82% of them.
277 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Adani’s ₹7,514 Crore Dharavi Redevelopment: 47,076 Homes Planned in Major Mumbai Project (5 km away).
Other projects nearby
- Residential and commercial development at plot bearing CTS no. 67, 67A, 67/1… — environmental approval granted, 0 m away
- Residential and commercial development at plot bearing CTS no. 67, 67A, 67/1… — under environmental review, 0 m away
- Residential and commercial development at plot bearing CTS no. 67 (pt.), 67A,… — lapsed, 0 m away
- Residential and Commercial Development along with PTC component at Village:… — cleared for impact study, 0 m away
- Residential and commercial development along with PTC component at Village:… — withdrawn, 0 m away
- Residential and commercial development along with PTC component at Village:… — withdrawn, 0 m away
- Residential and commercial development along with PTC component at Village:… — withdrawn, 0 m away
- Residential and commercial development along with PTC component at Village:… — environmental approval granted, 0 m away
More from Macrotech Developers Limited (Lodha) in Mumbai Suburban
- Residential development at CTS No. 372, 372/1 to 65 of village Kanjur, L.B.S.… — withdrawn
- Proposed redevelopment of "Om Shree Geetanjali Nagar CHSL" on Plot bearing CTS… — withdrawn
- Proposed By Proposed Residential project "Lodha Eternis" at C.T.S. No. 67,… — withdrawn
- Proposed redevelopment of "Om Shree Geetanjali Nagar CHSL" on Plot bearing CTS… — withdrawn
- Proposed redevelopment of Om Shree Geetanjali Nagar CHSL on Plot bearing CTS… — withdrawn
- Expansion of EC for Residential development at CTS No. 372, 372/1 to 65 of… — environmental approval granted
68 Lodha (Macrotech Developers) projects in Mumbai
All 132 Lodha (Macrotech Developers) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.