Quick answers
What is this project?
M/s. JSW Steel Coated Products Limited. The processing unit for Colour Coated Coils & Sheets, CR Coils & Sheets, Galvanized Coils & Sheets, Galvalume Coils & Sheets, Recovered HCL, Gaseous Nitrogen, At Plot No. A-10/1, A-10/2&A-11, MIDC, Kalmeshwar, Dist. Nagpur, State: Maharashtra. Seeking EC for regularization of existing Unit as per NGT Order dtd 12.02.20&MPCB Circular no./MPCB /ID (APC) /Rolling Mill/ TB/B-041 dtd. 20.07.21 is an approved industrial project in Kalmeshwar, Kalameshwar, Nagpur, Maharashtra. The site covers 85.1 acres.
Who is building it?
The applicant is Jsw Steel Coated Products Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 5 May 2026), as of 27 Nov 2026.
Where is it?
In Kalmeshwar, Kalameshwar, Nagpur, Maharashtra.
How big is it?
It has a stated cost of ₹917.5 crore and a site of 85.1 acres.
When was it filed?
The application was filed on 21 Sept 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 5 May 2026 |
| Application filed | 21 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Jsw Steel Coated Products Limited |
| Land area | 85.1 acres (34.4 ha) |
| Project cost | ₹917.5 crore |
| Village / locality | Kalmeshwar |
| Taluk / tehsil | Kalameshwar |
| District | Nagpur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-05852 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 21 Sept 2024 (this page) | Environmental approval granted | 85.1 acres | ₹917.5 crore |
| Early planning filed 31 Aug 2024 | Lapsed | 85.1 acres | ₹917.5 crore |
In context
79 applications in Nagpur since January 2022 are in the same category (Industry): 51 approved, 13 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 43 days from filing to approval. At 85.1 acres, this one is larger than 64% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kalmeshwar, Kalameshwar, Nagpur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- M/s. JSW Steel Coated Products Limited. The processing unit for Colour Coated… — lapsed, 0 m away
- Proposed Gondkhari Underground Coal Mine (Kamptee Coalfield) of area 862.00… — returned to applicant, 1 km away
- ESR Nagpur-2 Industrial and Logistic Park Project by M/s Suprindustrial Park… — environmental approval granted, 4.5 km away
- ESR Nagpur-2 Industrial and Logistic Park Project by M/s Suprindustrial Park… — environmental approval granted, 4.5 km away
- Dahegaon-Gowari Coal Block Underground Coal Mine — under environmental review, 7.4 km away
- Dahegaon-Gowari Coal Block Underground Coal Mine — cleared for impact study, 7.4 km away
- Dahegaon-Gowari Coal Block Underground Coal Mine — under forest review, 7.4 km away
- Dahegaon-Gowari Coal Block Underground Coal Mine — not approved, 7.4 km away
All 23 Jsw Steel Coated Products projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.