Quick answers
What is this project?
Expansion of "Mahakali Darshan" - of SRA Scheme on plot bearing C.T.S No 78A to 78H of village-Gundavali at W. Express highway Andheri (E), Mumbai. By M/S. Havemore Realty Pvt. Ltd is a proposed mixed-use project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. It plans buildings of up to 16 floors on 7.6 acres.
Who is building it?
The applicant is M/S. Havemore Realty Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 16 Mar 2024), as of 27 Nov 2026.
Where is it?
In Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra.
How big is it?
It has a stated cost of ₹1,219 crore and a site of 7.6 acres.
When was it filed?
The application was filed on 16 Mar 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion of "Mahakali Darshan" - of SRA Scheme on plot bearing C.T.S No 78A to 78H of…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 16 Mar 2024 |
| Application filed | 16 Mar 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | M/S. Havemore Realty Private Limited |
| Use | Mixed use |
| Floors (tallest) | 16 |
| Basements | 6 |
| Height | 51 m |
| Land area | 7.6 acres (3.1 ha) |
| Built-up area | 2,38,811 m² (25,70,538 sq ft) |
| Project cost | ₹1,219 crore |
| Village / locality | Greater Mumbai (M Corp.) |
| Taluk / tehsil | Mumbai Suburban |
| District | Mumbai Suburban |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-05857 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 4 Apr 2024 | Environmental approval granted | 7.6 acres | ₹1,219 crore |
| Early planning filed 16 Mar 2024 (this page) | Cleared for impact study | 7.6 acres | ₹1,219 crore |
In context
1,858 applications in Mumbai Suburban since January 2022 are in the same category (Buildings & townships): 1,230 approved, 196 filed or under review, and 432 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 7.6 acres, this one is larger than 81% of them.
519 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Adani’s ₹7,514 Crore Dharavi Redevelopment: 47,076 Homes Planned in Major Mumbai Project (10.1 km away).
Other projects nearby
- Expansion of "Mahakali Darshan" - of SRA Scheme on plot bearing C.T.S No 78A… — environmental approval granted, 0 m away
- Mahakali Darshan - Proposed Expansion of SRA Scheme on plot bearing C.T.S No… — cleared for impact study, 0 m away
- Environment Clearance for Proposed Sankalp SRA CHS as(Scheme-I)under… — under environmental review, 150 m away
- Proposed Slum Rehabilitation Scheme on plot bearing C.T.S. no. – 76, 77 & 69… — environmental approval granted, 150 m away
- Proposed Slum Rehabilitation Scheme on plot bearing C.T.S. no. – 76, 77 & 69… — withdrawn, 150 m away
- Residential Project by Mahindra Lifespace Developers Limited — environmental approval granted, 400 m away
- Residential Project by Mahindra Lifespace Developers Limited — cleared for impact study, 400 m away
- Proposed Redevelopment of Residential Buildings on Plot bearing C.T.S Nos.… — environmental approval granted, 450 m away
More from M/S. Havemore Realty Private Limited in Mumbai Suburban
- Mahakali Darshan - Proposed Expansion of SRA Scheme on plot bearing C.T.S No… — cleared for impact study
All 3 Havemore Realty projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.