One of 2 filings for this project. The project's main page, with every filing and where each stands: Amendment and Expansion in EC for residential project "Island City Centre" at C. S. No.…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 23 Aug 2024 |
| Application filed | 29 Jul 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | The Bombay Dyeing and Manufacturing Company Limited |
| Use | Residential |
| Land area | 32 acres (13 ha) |
| Built-up area | 6,47,135 m² (69,65,696 sq ft) |
| Project cost | ₹3,734.2 crore |
| Village / locality | Greater Mumbai (M Corp.) |
| Taluk / tehsil | Greater Mumbai |
| District | Mumbai |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-05934 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 5 Oct 2024 | Environmental approval granted | 32 acres | ₹3,734.2 crore |
| Early planning filed 29 Jul 2024 (this page) | Cleared for impact study | 32 acres | ₹3,734.2 crore |
In context
583 applications in Mumbai since January 2022 are in the same category (Buildings & townships): 446 approved, 58 filed or under review, and 79 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 32 acres, this one is larger than 97% of them.
448 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Greater Mumbai (M Corp.), Greater Mumbai, Mumbai, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Amendment and Expansion in EC for residential project "Island City Centre" at… — environmental approval granted, 0 m away
- Island City Centre, C. S. No 223, 120 & 1/128 Dadar Naigaon Division, G. D.… — lapsed, 50 m away
- Island City Centre, C. S. No 223, 120 & 1/128 Dadar Naigaon Division, G. D.… — cleared for impact study, 50 m away
- Island City Centre, C. S. No 223, 120 & 1/128 Dadar Naigaon Division, G. D.… — withdrawn, 50 m away
- Proposed expansion in cluster redevelopment scheme CDS under regulation 33(9)… — initial checks, 350 m away
- "Proposed Cluster Redevelopment Scheme CDS Under Regn.33(9) Of DCPR 2034… — environmental approval granted, 350 m away
- Application for EC for proposed Redevelopment of Residential cum Commercial… — environmental approval granted, 350 m away
- Amendment/Corrigendum for Proposed redevelopment of existing buildings known… — environmental approval granted, 400 m away
More from The Bombay Dyeing and Manufacturing Company Limited in Mumbai
- Island City Centre, C. S. No 223, 120 & 1/128 Dadar Naigaon Division, G. D.… — lapsed
- Island City Centre, C. S. No 223, 120 & 1/128 Dadar Naigaon Division, G. D.… — cleared for impact study
- Island City Centre, C. S. No 223, 120 & 1/128 Dadar Naigaon Division, G. D.… — withdrawn
All 5 The Bombay Dyeing projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.