One of 2 filings for this project. The project's main page, with every filing and where each stands: Environment Clearance for Proposed Stone & Murrum Quarry at Survey/Gut No.: 317/1/1B…
Project details
| Status | Withdrawn |
|---|---|
| Status since | 4 Apr 2025 |
| Application filed | 8 Nov 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Shejal Satish Naik |
| Land area | 3.7 acres (1.5 ha) |
| Project cost | ₹42 lakh |
| Village / locality | Shivdav |
| Taluk / tehsil | Kankavli |
| District | Sindhudurg |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-06021 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 30 Nov 2024 | Environmental approval granted | 3.7 acres | ₹42 lakh |
| New project filed 8 Nov 2024 (this page) | Withdrawn | 3.7 acres | ₹42 lakh |
In context
61 applications in Sindhudurg since January 2022 are in the same category (Mining): 34 approved, 10 filed or under review, and 17 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 3.7 acres, this one is smaller than 82% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 9.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 9 mining leases have applied within 5 km.
Where it is
Shivdav, Kankavli, Sindhudurg, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environment Clearance for Proposed Stone & Murrum Quarry at Survey/Gut No.:… — environmental approval granted, 0 m away
- Environmental Clearance for Proposed Stone & Murrum Quarry at Survey/Gut No.:… — initial checks, 150 m away
- Environmental Clearance for Proposed Stone & Murrum Quarry at Survey/Gut No.:… — under environmental review, 150 m away
- Environmental Clearance for Proposed Stone & Murrum Quarry at Survey/ Gut No.:… — environmental approval granted, 250 m away
- Re-appraisal of Environmental Clearance for Basalt Stone Quarry Project (Area… — environmental approval granted, 750 m away
- Re-appraisal of Environmental Clearance for Stone Quarry Project (Area 2.00… — lapsed, 1000 m away
- Reappraisal of prior environmental clearance of Mrs. Samrudhi Sandesh Parkar… — lapsed, 1000 m away
- Revalidation of Prior EC of Mrs. Samrudhi Sandesh Parkar located at Gut No.… — lapsed, 1000 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.