Quick answers
What is this project?
Proposed Expansion in Ec for Residential Project on Plot Bearing Cts No 554a to F of Village-Valnai & Cts No. 740 & 740/1 & 2, 729b, 729b/1 to 5 of Village-Malad(North) at Malad(West), Mumbai by M/S. American Spring and Pressing Works PVT LTD is a withdrawn building project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The site covers 9.5 acres.
Who is building it?
The applicant is American Spring and Pressing Works Pvt Ltd.
Has it been approved?
No. The application was withdrawn on 27 Feb 2025, so it is no longer under consideration.
Where is it?
In Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra.
How big is it?
It has a stated cost of ₹650 crore and a site of 9.5 acres.
When was it filed?
The application was filed on 15 Oct 2024.
One of 5 filings for this project. The project's main page, with every filing and where each stands: Proposed Expansion in Ec for Residential Project on Plot Bearing Cts No 554a to F of…
Project details
| Status | Withdrawn |
|---|---|
| Status since | 27 Feb 2025 |
| Application filed | 15 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | American Spring and Pressing Works Pvt Ltd |
| Use | Other |
| Land area | 9.5 acres (3.8 ha) |
| Project cost | ₹650 crore |
| Village / locality | Greater Mumbai (M Corp.) |
| Taluk / tehsil | Mumbai Suburban |
| District | Mumbai Suburban |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-06029 |
All filings for this project
This project has 5 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 24 Nov 2026 | Under environmental review | 9.5 acres | ₹800 crore |
| Expansion filed 15 Oct 2024 (this page) | Withdrawn | 9.5 acres | ₹650 crore |
| Early planning filed 1 Oct 2024 | Cleared for impact study | 9.5 acres | ₹650 crore |
| Expansion filed 17 Jun 2024 | Environmental approval granted | 9.5 acres | ₹650 crore |
| Early planning filed 3 Apr 2024 | Cleared for impact study | 9.5 acres | ₹650 crore |
In context
1,858 applications in Mumbai Suburban since January 2022 are in the same category (Buildings & townships): 1,230 approved, 196 filed or under review, and 432 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 9.5 acres, this one is larger than 85% of them.
612 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Adani’s ₹7,514 Crore Dharavi Redevelopment: 47,076 Homes Planned in Major Mumbai Project (12.3 km away).
Other projects nearby
- Proposed Expansion in Ec for Residential Project on Plot Bearing Cts No 554a… — cleared for impact study, 0 m away
- Proposed Expansion in Ec for Residential Project on Plot Bearing Cts No 554a… — environmental approval granted, 0 m away
- Proposed Expansion in Ec for Residential Project on Plot Bearing Cts No 554a… — under environmental review, 0 m away
- Proposed Expansion in Ec for Residential Project on Plot Bearing Cts No 554a… — cleared for impact study, 50 m away
- Building project by M/s. Mahavir Land Developer — environmental approval granted, 150 m away
- Proposed S. R. Scheme U/ Reg. 33(10) of DCPR 2034 on Property Bearing C.T.S.… — under environmental review, 200 m away
- Proposed S.R. Scheme on non-slum plot bearing CTS NOS. 524, 524/1 TO 16 of… — environmental approval granted, 300 m away
- Proposed S.R. Scheme on non-slum plot bearing CTS NOS. 524, 524/1 TO 16 of… — lapsed, 300 m away
All 5 American Spring and projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.