Proposed development project "Jefro Kingsfort" at S. no. 5/2, Village Mamurdi, Taluka-Haveli, Pune by M/s. Jefro Realty LLP

Proposed development project "Jefro Kingsfort" at S. no. 5/2, Village Mamurdi, Taluka-Haveli, Pune by M/s. Jefro Realty LLP is an approved residential project in Mamurdi, Haveli, Pune, Maharashtra. The site covers 1.5 acres. Its stated project cost is ₹40.1 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 12 Sept 2025).

See it on the live map All projects in Pune

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusEnvironmental approval granted
Status since12 Sept 2025
Application filed18 Jun 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantJefro Realty LLP
UseResidential
Land area1.5 acres (0.6 ha)
Built-up area31,000 m² (3,33,681 sq ft)
Project cost₹40.1 crore
Village / localityMamurdi
Taluk / tehsilHaveli
DistrictPune
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-06133

What the filings say

What is planned

The applicant, M/s. Jefro Realty LLP, proposes a residential and commercial development project named "Jefro Kingsfort" in Mamurdi, Pune. According to the project documents, the development will consist of two residential buildings with essential amenities and landscaped areas.

Detailed layout plans for Building A specify a structure with a height of 68.75 metres. The building configuration includes a basement, ground floor, a mezzanine level, a first floor, a first-floor mezzanine, and 20 upper floors. Refuge areas are planned at the 7th, 12th, and 17th floor levels.

Layout and design

The project site includes several functional zones and utility installations. The layout plan indicates:

Parking is designed using a combination of covered parking spaces and stack parking systems. Internal vehicle movement is facilitated by 5.00-metre and 6.00-metre wide driveways, with a ramp leading down to the basement parking area. The site is bordered by an 18.00-metre wide Development Plan (DP) road, with specific sections of the plot designated for road widening.

Environmental safeguards

The applicant has submitted an Environmental Management Plan (EMP) to mitigate impacts during construction and operation. Key measures include:

Water, power and access

Water requirements for landscaping will be met using recycled water from the on-site STP. Power backup will be provided by DG sets compliant with Central Pollution Control Board (CPCB) norms for noise and air emissions. Primary access to the site is via the existing 5.00-metre wide road, which is proposed to be widened to 6.00 metres, and the adjacent 18.00-metre DP road.

Development Project "Jefro Kingsfort" site plan and layout

A drawing from the project's filings. Sign in free to see it.

Development Project "Jefro Kingsfort": Layout plan: Building A, club house, parking zones, and road widening areas (preview)🔒 Sign in free to see it
Layout plan: Building A, club house, parking zones, and road widening areas

In context

3,029 applications in Pune since January 2022 are in the same category (Buildings & townships): 2,001 approved, 415 filed or under review, and 613 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 1.5 acres, this one is smaller than 86% of them.

248 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Mamurdi, Haveli, Pune, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Jefro Realty LLP in Pune

All 4 Jefro Realty projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.