Project details
| Status | Lapsed |
|---|---|
| Status since | 14 Dec 2025 |
| Application filed | 17 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Mining |
| Applicant | Ashwini Infradevelopments Private Limited |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹90 lakh |
| Village / locality | Boriwali Tarf Khairne |
| Taluk / tehsil | Thane |
| District | Thane |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-06189 |
In context
39 applications in Thane since January 2022 are in the same category (Mining): 11 approved, 8 filed or under review, and 20 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 4.9 acres, this one is smaller than 72% of them.
5 other mining leases have applied within 500 m of this site; together with this one they cover 27.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 7 mining leases have applied within 5 km.
Where it is
Boriwali Tarf Khairne, Thane, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building project by Gramercy Business Hub Private Limited — environmental approval granted, 50 m away
- Re-validation of EC of Stone Quarry of G. D. Land of M/s Panchankur Stone Quarry — lapsed, 150 m away
- Re-Appraisal of Basalt Stone Quarry Located at Survey No. 76, Village Borivali… — lapsed, 150 m away
- Re-Appraisal of Basalt Stone Quarry Located at Survey No. 76(Part), Village… — environmental approval granted, 150 m away
- Re-validation of EC of Stone Quarry of M/s Material Pioneer Construction Company — lapsed, 200 m away
- Re-validation of EC of Stone Quarry of Saket Engineering Construction Co. — lapsed, 300 m away
- Proposed India Jewellery Park at MIDC Plot No. EL-237, Mahape, Navi Mumbai — environmental approval granted, 500 m away
- Proposed India Jewellery Park at MIDC Plot No. EL-237, Mahape, Navi Mumbai — cleared for impact study, 500 m away
All 3 Ashwini Infradevelopments projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.