Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 30 Apr 2025 |
| Application filed | 27 Jun 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Mining |
| Applicant | M/S Moil Limited (A Government of India Enterprise) |
| Land area | 99.9 acres (40.4 ha) |
| Project cost | ₹2 lakh |
| Village / locality | Pathari (Nakadongari |
| Taluk / tehsil | Tumsar |
| District | Bhandara |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-06234 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 27 Jun 2024 (this page) | Environmental approval granted | 99.9 acres | ₹2 lakh |
| Early planning filed 8 Jun 2023 | Cleared for impact study | 99.9 acres | ₹2 lakh |
In context
422 applications in Bhandara since January 2022 are in the same category (Mining): 291 approved, 2 filed or under review, and 129 withdrawn, lapsed or rejected. The approved ones took a median of 19 days from filing to approval. At 99.9 acres, this one is larger than 87% of them.
No other mining lease on record is within 500 m of this site; 14 have applied within 5 km.
Where it is
Pathari (Nakadongari, Tumsar, Bhandara, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion in production of Pathari Sand Mining project… — cleared for impact study, 0 m away
- Environment Clearance for Dhutera 1 Sand Ghat over an extent of 3.36 ha. at… — environmental approval granted, 2 km away
- Transfer of Environmental Clearance Dhutera 1 Sand Ghat over an extent of 3.36… — environmental approval granted, 2 km away
- Transfer of Environmental Clearance Aashti Aanjan Vihri 2 Sand Ghat over an… — environmental approval granted, 3 km away
- Environment Clearance for Aashti Aanjan Vihri 2 Sand Ghat over an extent of… — environmental approval granted, 3 km away
- Transfer of Environmental Clearance Dhutera 2 Sand Ghat over an extent of 3.33… — environmental approval granted, 3 km away
- Environment Clearance for Dhutera 2 Sand Ghat over an extent of 3.33 ha. at… — environmental approval granted, 3 km away
- Environment Clearance for Aashti/Aajan Vihri Sand Ghat over an extent of 1.57… — withdrawn, 3.6 km away
More from M/S Moil Limited (A Government of India Enterprise) in Bhandara
- Wildlife Proposal towards tiger corridor and necessary approval from NBWL,… — under wildlife review
- Preparation of Wildlife Proposal Towards Tiger Corridor and Necessary Approval… — more information requested
- Chikla Maganese Mine — environmental approval granted
7 Moil projects in Bhandara
All 25 Moil projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.