What is Developing? Open the mapMap

Not approvedBuildings & townships · Mumbai Suburban, Maharashtra

Application for EC for the proposed SRA Scheme project on Plot bearing CTS No. 1(pt) of Village – Ghatkopar, Taluka – Kurla, Ghatkopar (W), Mumbai by M/s. Lake View Developers Pvt. Ltd.

Application for EC for the proposed SRA Scheme project on Plot bearing CTS No. 1(pt) of Village – Ghatkopar, Taluka – Kurla, Ghatkopar (W), Mumbai by M/s. Lake View Developers Pvt. Ltd is a rejected residential project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The site covers 15.9 acres. Its stated project cost is ₹426 crore. As of 27 Nov 2026, its status is “Not approved” (since 12 Nov 2025).

See it on the live map All projects in Mumbai Suburban

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Application for EC for the proposed SRA Scheme project on Plot bearing CTS No. 1(pt) of Village – Ghatkopar, Taluka – Kurla, Ghatkopar (W), Mumbai by M/s. Lake View Developers Pvt. Ltd is a rejected residential project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The site covers 15.9 acres.

Who is building it?

The applicant is Lake View Developers Private Limited.

Has it been approved?

No. The application was rejected on 12 Nov 2025.

Where is it?

In Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra.

How big is it?

It has a stated cost of ₹426 crore and a site of 15.9 acres.

When was it filed?

The application was filed on 22 May 2024.

Project details

StatusNot approved
Status since12 Nov 2025
Application filed22 May 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantLake View Developers Private Limited
UseResidential
Land area15.9 acres (6.4 ha)
Built-up area1,44,239 m² (15,52,574 sq ft)
Project cost₹426 crore
Village / localityGreater Mumbai (M Corp.)
Taluk / tehsilMumbai Suburban
DistrictMumbai Suburban
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-06261

What the filings say

What is planned

Lake View Developers Private Limited proposes a Slum Rehabilitation Authority (SRA) scheme at Ghatkopar (West) in Mumbai. The project involves the demolition of existing slums and the construction of a residential-cum-commercial complex. The total construction area is planned at 1,44,238.50 square metres, comprising an FSI (Floor Space Index) area of 90,427.44 square metres and a non-FSI area of 53,811.06 square metres.

The development consists of seven buildings with varying configurations and heights:

Building No.ConfigurationHeight (m)Units (Flats/Shops/Amenities)
1 (Wings A, B, C)Stilt + 23 upper floors69.802,861 Total
2 (Wings A, B)Stilt + 21 upper floors67.50-
3 (Wings A, B)Stilt + 23 upper floors69.80-
4Stilt + 13 upper floors42.90-
5Stilt + 13 upper floors42.60-
6Stilt + 13 upper floors43.60-
7Stilt + 13 upper floors41.90-

The project will provide a total of 2,861 units, which includes 2,647 residential flats (all 1 BHK), 122 commercial shops, and 92 amenity structures. The total population for the scheme is estimated at 11,230 persons.

Layout and design

The conceptual plan indicates a layout with multiple wings and driveways. A 9.00-metre wide driveway is planned within the site, along with a ramp down at a 1:10 slope. The site includes two religious structures that are to be retained or accommodated. Open spaces for recreation (RG) are distributed across the plot, including areas of 718.70 square metres and 879.90 square metres. For parking, the applicant plans to provide 408 four-wheeler spaces.

Land and surroundings

The project is located on a plot of 6.42 hectares (15.86 acres) in a fully urbanised area. The land is currently occupied by slums, which will be demolished, generating approximately 3,000 cubic metres of demolition waste. The site is accessible via a 24-metre wide Development Plan (DP) road.

Environmental sensitivities within a 15 km radius include:

There are 40 trees currently on the plot. The applicant proposes to cut 13 trees, transplant 13 trees, and retain 14 trees.

Water, power and access

The total water requirement is estimated at 1,458 kilolitres per day (KLD), to be sourced from the Brihanmumbai Municipal Corporation (BMC). Of this, 969 KLD will be fresh water. The project includes a Sewage Treatment Plant (STP) with a capacity of 1,500 KLD. Treated water will be reused for flushing (489 KLD) and gardening (12 KLD), with the remaining 847 KLD of excess treated water discharged into the municipal sewer lines.

The total connected electrical load is 6.9 MW, with a demand load of 4.1 MW, to be supplied by Adani Electricity. Diesel Generator (DG) sets will be provided for emergency backup for common area lighting, fire pumps, and one lift per building. Solar photovoltaic panels are proposed for common area lighting.

Environmental safeguards

Solid waste generation is estimated at 5,422 kg per day. The applicant plans to treat biodegradable waste using a mechanical composting method, while non-biodegradable waste will be segregated and handed over to the local body. Dried sludge from the STP will be used as manure for landscaping.

For air quality management during construction, dust suppression measures like road watering will be used. The building design includes energy conservation features such as double-glazed glass (Reflective + A12 + 6mm) and shading to reduce cooling loads. Rainwater harvesting is planned for terrace runoff, which will be collected in tanks. The project is designed to meet Seismic Zone III standards.

Lake View Developers Application for EC for the Proposed SRA Scheme site plan and layout

3 drawings from the project's filings. Sign in free to see them.

Lake View Developers Application for EC for the Proposed SRA Scheme: Conceptual Plan: Building wings, driveways, and recreational green areas (preview)🔒 Sign in free to see it
Conceptual Plan: Building wings, driveways, and recreational green areas
Lake View Developers Application for EC for the Proposed SRA Scheme: Site layout: Ramp details and building footprints (preview)🔒 Sign in free to see it
Site layout: Ramp details and building footprints
Lake View Developers Application for EC for the Proposed SRA Scheme: Location map showing project site in Ghatkopar (preview)🔒 Sign in free to see it
Location map showing project site in Ghatkopar

In context

1,858 applications in Mumbai Suburban since January 2022 are in the same category (Buildings & townships): 1,230 approved, 196 filed or under review, and 432 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 15.9 acres, this one is larger than 91% of them.

316 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Close to Adani’s ₹7,514 Crore Dharavi Redevelopment: 47,076 Homes Planned in Major Mumbai Project (5.8 km away).

Other projects nearby

More from Lake View Developers Private Limited in Mumbai Suburban

All 3 Lake View Developers projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.