Quick answers
What is this project?
Application for Amendment / Expansion in EC for the Integrated Township Project at Mouza – Pipla, Tal – Nagpur (Gramin), Dist – Nagpur, Maharashtra by M/s. LUXORA INFRASTRUCTURE PVT. LTD is an approved township project in Ghogali, Nagpur (Rural), Nagpur, Maharashtra. The site covers 286.6 acres.
Who is building it?
The applicant is Luxora Infrastructure Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 10 Dec 2024), as of 27 Nov 2026.
Where is it?
In Ghogali, Nagpur (Rural), Nagpur, Maharashtra.
How big is it?
It has a stated cost of ₹2,000 crore and a site of 286.6 acres.
When was it filed?
The application was filed on 23 May 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 10 Dec 2024 |
| Application filed | 23 May 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Luxora Infrastructure Private Limited |
| Use | Township |
| Land area | 286.6 acres (116 ha) |
| Built-up area | 5,80,000 m² (62,43,062 sq ft) |
| Plot area | 11,60,000 m² (1,24,86,124 sq ft) |
| Project cost | ₹2,000 crore |
| Village / locality | Ghogali |
| Taluk / tehsil | Nagpur (Rural) |
| District | Nagpur |
| State | Maharashtra |
| Location from | Site area on record |
| Our reference | WID-MH-06373 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 23 May 2024 (this page) | Environmental approval granted | 286.6 acres | ₹2,000 crore |
| Early planning filed 23 Dec 2023 | Cleared for impact study | 286.6 acres | ₹2,000 crore |
In context
168 applications in Nagpur since January 2022 are in the same category (Buildings & townships): 128 approved, 22 filed or under review, and 18 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 286.6 acres, this one is larger than 96% of them.
18 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ghogali, Nagpur (Rural), Nagpur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Application for Amendment / Expansion in EC for the Integrated Township… — cleared for impact study, 150 m away
- New Construction Project, "Lakeshore Oasis" at Mouza-Pipla, Tah-… — environmental approval granted, 800 m away
- Proposed Residential Group Housing scheme — environmental approval granted, 1 km away
- Proposed Commercial & Residential Group Housing Scheme at KH. No. 122, PH. No.… — environmental approval granted, 1.1 km away
- Proposed Group Housing Multi Family Building Project At Gat No.145/B, PH. No.… — environmental approval granted, 1.1 km away
- Proposed Commercial and Residential Buildings on Khasra no-162, Mouza-Pipla,… — environmental approval granted, 1.4 km away
- Proposed Residential Project at S. No-169/1/B, 169/4 & 169/3, P.H.NO. 38,… — environmental approval granted, 1.6 km away
- Proposed Construction for Commercial Cum Residential Building Project at CTS… — environmental approval granted, 1.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.