What is Developing? Open the mapMap

Environmental approval grantedBuildings & townships · Mumbai, Maharashtra

Proposed Residential cum Commercial development at C. S. No. 1913 of Byculla Division Building situated at Maulana Azad Road, Mumbai-400007

Proposed Residential cum Commercial development at C. S. No. 1913 of Byculla Division Building situated at Maulana Azad Road, Mumbai-400007 is an approved mixed-use project in Greater Mumbai (M Corp.), Greater Mumbai, Mumbai, Maharashtra. The site covers 7 acres. Its stated project cost is ₹371 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 26 Nov 2024).

See it on the live map All projects in Mumbai

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 3 filings for this project. The project's main page, with every filing and where each stands: Proposed Residential cum Commercial development at C. S. No. 1913 of Byculla Division…

Project details

StatusEnvironmental approval granted
Status since26 Nov 2024
Application filed23 Apr 2024
Approval soughtEnvironmental approval
Application typeExpansion
SectorBuildings & townships
ApplicantLodha Developers Limited
UseMixed use
Land area7 acres (2.8 ha)
Plot area28,426 m² (3,05,975 sq ft)
Project cost₹371 crore
Village / localityGreater Mumbai (M Corp.)
Taluk / tehsilGreater Mumbai
DistrictMumbai
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-06482

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Ownership transfer filed 31 Jan 2026Environmental approval granted7 acres₹371 crore
Expansion filed 23 Apr 2024 (this page)Environmental approval granted7 acres₹371 crore
Early planning filed 13 Mar 2024Cleared for impact study7 acres₹371 crore

In context

583 applications in Mumbai since January 2022 are in the same category (Buildings & townships): 446 approved, 58 filed or under review, and 79 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 7 acres, this one is larger than 77% of them.

480 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Greater Mumbai (M Corp.), Greater Mumbai, Mumbai, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Lodha Developers Limited in Mumbai

68 Lodha (Macrotech Developers) projects in Mumbai
All 132 Lodha (Macrotech Developers) projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.