Quick answers
What is this project?
Proposed 2 x 660 MW Super Critical Thermal Power Project (Expansion) within the premises of 2400 MW Koradi Power Plant by MAHAGENCO is an approved power project in Koradi (N.V.), Kamptee, Nagpur, Maharashtra. The site covers 165.6 acres.
Who is building it?
The applicant is Maharashtra State Power Generation Company Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 15 Apr 2026), as of 27 Nov 2026.
Where is it?
In Koradi (N.V.), Kamptee, Nagpur, Maharashtra.
How big is it?
It has a stated cost of ₹29,660 crore and a site of 165.6 acres.
When was it filed?
The application was filed on 7 Aug 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 15 Apr 2026 |
| Application filed | 7 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Power |
| Applicant | Maharashtra State Power Generation Company Limited |
| Land area | 165.6 acres (67 ha) |
| Project cost | ₹29,660 crore |
| Village / locality | Koradi (N.V.) |
| Taluk / tehsil | Kamptee |
| District | Nagpur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-06498 |
In context
10 applications in Nagpur since January 2022 are in the same category (Power): 3 approved, 5 filed or under review, and 2 withdrawn, lapsed or rejected. At 165.6 acres, this one is larger than 50% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Koradi (N.V.), Kamptee, Nagpur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 392 EWS Units for N.M.C. Safai Karmachari on Plot Bearing C.T.S. No. 62, Sheet… — environmental approval granted, 4.6 km away
- Environment Clearance for Saholi (A) Sand Ghat over an extent of 1.6 ha. At… — environmental approval granted, 5.1 km away
- Proposed Residential Building For Pradhan Mantri Awas Yojana 2.0 (Urban) on… — environmental approval granted, 5.5 km away
- Environment Clearance for Saholi (B) Sand Ghat over an extent of 2.50 ha. At… — environmental approval granted, 5.7 km away
- Environment Clearance for Saholi-A Sand Ghat over an extent of 1.60 ha at… — environmental approval granted, 5.8 km away
- Environment Clearance for Saholi-B Sand Ghat over an extent of 1.08 ha at… — environmental approval granted, 5.8 km away
- Diversion of 3.90 Ha. Forest Land for diversion of Khaparkheda- Parseoni PWD… — lapsed, 5.8 km away
- Diversion of 4.362 Ha. Forest Land for diversion of Khaparkheda- Parseoni PWD… — in-principle approval, conditions pending, 5.8 km away
All 4 Maharashtra State Power projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.