Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Oct 2024 |
| Application filed | 5 Apr 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Moonstone Realinfra Private Limited |
| Land area | 8.6 acres (3.5 ha) |
| Project cost | ₹399.3 crore |
| Village / locality | Punwel |
| Taluk / tehsil | Mulshi |
| District | Pune |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-06591 |
What the filings say
What is planned
Moonstone Real Infra Pvt. Ltd proposes to develop a residential project on a 3.49-hectare (8.62-acre) barren site in Punawale, Pune. The applicant's project report states that the development will consist of eight residential towers and a separate building for a Multi-Level Car Parking (MLCP) and club house.
The project is designed to accommodate 1,210 residential flats with an estimated total population of 6,050 people. The total built-up area is planned at 1,72,454.15 square metres, comprising an FSI (Floor Space Index) area of 1,34,131.45 square metres and a non-FSI area of 38,312.70 square metres.
Building Configuration
| Building Name | Configuration | Height (m) |
|---|---|---|
| Tower 1 & 2 | Stilt + 22 floors | 69 |
| Tower 3 to 8 | Lower Ground + Stilt + 22 floors | 69 |
| MLCP + Club House | Lower Ground + P1 to P4 | 15 |
Layout and design
The master layout shows the eight towers arranged around the periphery of the site, with a central landscape area situated on top of the MLCP. The site includes several designated open spaces on the ground, including areas of 949.99 square metres, 1,043.12 square metres, and 1,412.43 square metres. A 6-metre wide internal driveway system provides access throughout the complex, with turning radii ranging from 9 to 11 metres. The ground coverage is estimated at 9,502.53 square metres, representing 28.47% of the net plot area.
Land and surroundings
The project site is located in a residential zone as per the Pimpri Chinchwad Municipal Corporation (PCMC) development plan. It is currently barren land with no existing construction or trees. The site is accessible via an existing 9-metre wide road, which is proposed to be widened to 18 metres. Nearby amenities include Adhira International School (0.60 km), Life Care Hospital (1.37 km), and Pranshu Supermarket (0.62 km).
Water, power and access
Water Supply
During the operation phase, the total water requirement is estimated at 901 kilolitres per day (KLD). This will be sourced from the PCMC and supplemented by tankers. The daily requirement is broken down into:
- Domestic: 545 KLD
- Flushing: 272 KLD (recycled water)
- Gardening: 64 KLD (recycled water)
- Swimming Pool: 20 KLD
Sewage generation is expected to be 545 KLD, which will be treated in an on-site Sewage Treatment Plant (STP) with a capacity of 740 KLD. Treated water will be reused for flushing and irrigation, with the excess discharged into the municipal sewer line.
Power
The total demand load for the project is estimated at 3,250 kW, with a connected load of 7,780 kW, to be supplied by MSEDCL. Six transformers of 630 kVA each are planned. For emergency backup, the project will use two DG sets (400 kVA and 320 kVA). Renewable energy measures include solar photovoltaic panels intended to provide 5% of the demand load.
Environmental safeguards
Solid waste generation is estimated at 3,025 kg/day, consisting of 1,815 kg/day of biodegradable waste and 1,210 kg/day of non-biodegradable waste. Biodegradable waste will be processed on-site using three Organic Waste Converters (OWC) with a total capacity of 1,900 kg/day.
For rainwater management, the applicant proposes a harvesting scheme with recharge pits, estimated to cost ₹15.90 lakh. Landscape development is planned for at least 10% of the plot area, involving the plantation of 417 native trees. During construction, topsoil (approximately 1,530 cubic metres) will be harvested and stored for later use in landscaping.
- Moonstone Real Infra Residential Project Sr. No. 31/1 & 32/1, 3, 5, 6 Village- Punawale, Taluka- Mulshi, Pune site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
3,029 applications in Pune since January 2022 are in the same category (Buildings & townships): 2,001 approved, 415 filed or under review, and 613 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 8.6 acres, this one is larger than 70% of them.
516 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Punwel, Mulshi, Pune, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance for Proposed Residential Project Sr. No. 31/1 & 32/1,… — cleared for impact study, 0 m away
- Environmental Clearance for Proposed Residential Project Sr. No. 31/1 & 32/1,… — environmental approval granted, 0 m away
- Environmental Clearance for Proposed Residential Project Sr. No. 31/1 & 32/1,… — cleared for impact study, 0 m away
- Environmental Clearance for Proposed Residential Project Sr. No. 31/1 & 32/1,… — cleared for impact study, 0 m away
- Proposed Residential & Commercial Project at - Plot no.3, Survey no… — withdrawn, 150 m away
- Proposed Residential & Commercial Project at - Plot no.3, Survey no… — withdrawn, 150 m away
- Proposed Residential & Commercial Project at - Plot no.3, Survey no… — environmental approval granted, 150 m away
- Proposed Residential & Commercial project at S. no. 31/32/A/5 , 31/32/A/6 &… — withdrawn, 200 m away
More from Moonstone Realinfra Private Limited in Pune
- Proposed Residential Project on S.No. 34/2/2/2 & 34/2/2/3, Village Punawale,… — lapsed
- Environmental Clearance for Proposed Residential Project Sr. No. 31/1 & 32/1,… — cleared for impact study
- Environment Clearance for Proposed Residential Project "Kohinoor Smartville"… — lapsed
- Environmental Clearance for Proposed Residential Project Sr. No. 31/1 & 32/1,… — environmental approval granted
- Environmental Clearance for Proposed Residential Project Sr. No. 31/1 & 32/1,… — cleared for impact study
- Environmental Clearance for Proposed Residential Project Sr. No. 31/1 & 32/1,… — cleared for impact study
All 7 Moonstone Realinfra projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.