Project details
| Status | Under environmental review |
|---|---|
| Status since | 2 Oct 2024 |
| Application filed | 2 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Spsc Power |
| Land area | 2.2 acres (0.9 ha) |
| Project cost | ₹3.2 crore |
| Village / locality | Hingana |
| Taluk / tehsil | Tumsar |
| District | Bhandara |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-06657 |
In context
11 applications in Bhandara since January 2022 are in the same category (Industry): 4 approved, 6 filed or under review, and 1 withdrawn, lapsed or rejected. At 2.2 acres, this one is smaller than 91% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Hingana, Tumsar, Bhandara, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Manufacturing of 2,500 TPM of Manganese Oxide at Khasra No. 67/6 &… — cleared for impact study, 0 m away
- Expansion & Modification of Grinding Unit (Under Construction) by Adding 2000… — withdrawn, 0 m away
- Proposed Expansion of Mineral Ore Beneficiation Plant by M/s. Shri Sainath… — environmental approval granted, 2.4 km away
- Diversion of 2.6244 Hac forest land for Construction of 132 KV Madgi… — more information requested, 4.7 km away
- "Diversion of 2.6244 ha of Forest land for the Construction of LOC No. AP-1 to… — more information requested, 4.7 km away
- Dongargaon Quartz & Quartzite Mine (4.68 Ha) Khasara No.497p… — environmental approval granted, 6 km away
- Proposed Expansion of Existing Grinding and Screening of Manganese Ore Unit… — cleared for impact study, 9 km away
- Proposed Common Biomedical Waste Treatment Facility (CBWTF) — environmental approval granted, 9.2 km away
More from Spsc Power in Bhandara
- Proposed Manufacturing of 2,500 TPM of Manganese Oxide at Khasra No. 67/6 &… — cleared for impact study
- Expansion & Modification of Grinding Unit (Under Construction) by Adding 2000… — withdrawn
All 3 Spsc Power projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.