Project details
| Status | Not approved |
|---|---|
| Status since | 19 Aug 2025 |
| Application filed | 21 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Krisala Landmarks Private Limited |
| Use | Mixed use |
| Land area | 2.2 acres (0.9 ha) |
| Project cost | ₹190.8 crore |
| Village / locality | Hinjavadi |
| Taluk / tehsil | Mulshi |
| District | Pune |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-06692 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 18 Mar 2025 | Withdrawn | 2.2 acres | ₹190.8 crore |
| New project filed 21 Oct 2024 (this page) | Not approved | 2.2 acres | ₹190.8 crore |
In context
3,029 applications in Pune since January 2022 are in the same category (Buildings & townships): 2,001 approved, 415 filed or under review, and 613 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 2.2 acres, this one is smaller than 73% of them.
511 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Hinjavadi, Mulshi, Pune, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Residential & Commercial project "41 Zoy" at Sr. No. 236P, 237P,… — withdrawn, 0 m away
- Proposed Residential & Commercial project "41 Zoy" at Sr. No. 236P, 237P,… — environmental approval granted, 0 m away
- Environmental clearance for proposed Industrial building on S. No.… — environmental approval granted, 150 m away
- Environmental clearance for proposed Industrial building on S. No.… — withdrawn, 150 m away
- Environmental clearance for proposed Industrial building on S. No.… — withdrawn, 150 m away
- Expansion in Proposed Residential and Commercial Project "I Trend City Life"… — environmental approval granted, 350 m away
- Environmental Clearance of Proposed IT Building at Plot No 37, Rajiv Gandhi… — environmental approval granted, 500 m away
- Expansion in Proposed Building Layout comprising plot Nos 1, 2, 13 & 14 at… — under environmental review, 500 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.