What is Developing? Open the mapMap

Under environmental reviewBuildings & townships · Raigarh, Maharashtra

Proposed Residential cum Commercial Building on S.no. 5/0 & 6/C by M/s. Rudra Infraworld LLP

Proposed Residential cum Commercial Building on S.no. 5/0 & 6/C by M/s. Rudra Infraworld LLP is a proposed building project in Dharnagaon, Panvel, Raigarh, Maharashtra. The site covers 1 acre. Its stated project cost is ₹101.9 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 13 Aug 2025).

See it on the live map All projects in Raigarh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Residential cum Commercial Building on S.no. 5/0 & 6/C by M/s. Rudra Infraworld LLP is a proposed building project in Dharnagaon, Panvel, Raigarh, Maharashtra. The site covers 1 acre.

Who is building it?

The applicant is Rudra Infraworld LLP.

Has it been approved?

Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.

Where is it?

In Dharnagaon, Panvel, Raigarh, Maharashtra.

How big is it?

It has a stated cost of ₹101.9 crore and a site of 1 acre.

When was it filed?

The application was filed on 5 Mar 2025.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Residential cum Commercial Building on S.no. 5/0 & 6/C by M/s. Rudra Infraworld…

Project details

Official titleProposed Residential cum Commercial Building on S.no. 5/0 & 6/C at Village Dharnagaon, Taluka Panvel, District Raigad by M/s. Rudra Infraworld LLP
StatusUnder environmental review
Status since13 Aug 2025
Application filed5 Mar 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantRudra Infraworld LLP
Land area1 acres (0.4 ha)
Project cost₹101.9 crore
Village / localityDharnagaon
Taluk / tehsilPanvel
DistrictRaigarh
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-06919

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 1 Jul 2025Environmental approval granted1 acre₹101.9 crore
New project filed 5 Mar 2025 (this page)Under environmental review1 acre₹101.9 crore

In context

674 applications in Raigarh since January 2022 are in the same category (Buildings & townships): 403 approved, 85 filed or under review, and 186 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1 acre, this one is smaller than 76% of them.

148 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Dharnagaon, Panvel, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.