Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 4 Aug 2025 |
| Application filed | 1 Aug 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Himalaya Terpenes Private Limited |
| Land area | 4 acres (1.6 ha) |
| Project cost | ₹48 crore |
| Village / locality | Jamghar |
| Taluk / tehsil | Vada |
| District | Palghar |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-07022 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 8 Sept 2026 | Under environmental review | 4 acres | ₹48 crore |
| Early planning filed 1 Aug 2025 (this page) | Cleared for impact study | 4 acres | ₹48 crore |
In context
159 applications in Palghar since January 2022 are in the same category (Industry): 100 approved, 40 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 36 days from filing to approval. At 4 acres, this one is larger than 76% of them.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jamghar, Vada, Palghar, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed new project for manufacturing of Synthetic Organic Chemicals by M/s.… — under environmental review, 0 m away
- Regularization of Existing Induction Furnace for Manufacturing of 54500 TPA… — more information requested, 2.3 km away
- Proposed Expansion for the Production of MS Billets from 1,84,500 TPA to… — lapsed, 2.3 km away
- Expansion of Synthetic Organic Chemicals Manufacturing Unit — environmental approval granted, 2.4 km away
- Expansion of Synthetic Organic Chemicals Manufacturing Unit — lapsed, 2.4 km away
- "Common Bio-Medical Waste Treatment Facility" (CBWTF) by M/s Atharv… — under environmental review, 4.1 km away
- Proposed Manufacturing of M.S. Billets & Structural Steel by M/s. DEEVIN… — more information requested, 4.4 km away
- Proposed Manufacturing of M.S. Billets & Structural Steel by M/s. DEEVIN… — under environmental review, 4.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.