What is Developing? Open the mapMap

Cleared for impact studyBuildings & townships · Mumbai Suburban, Maharashtra

Amendment in Environmental Clearance for Slum Rehabilitation Scheme Jankalyan CHS at CTS no. 1625 (pt), 1648(pt), 1653(pt), 1654(pt), 1657(pt) and 1663B (pt) village Dahisar, Shanti Nagar Zopadapatti, Dongari S.V road Dahisar Mumbai proposed by M/s. N. Rose Developers Pvt. Ltd.

Amendment in Environmental Clearance for Slum Rehabilitation Scheme Jankalyan CHS at CTS no. 1625 (pt), 1648(pt), 1653(pt), 1654(pt), 1657(pt) and 1663B (pt) village Dahisar, Shanti Nagar Zopadapatti, Dongari S.V road Dahisar Mumbai proposed by M/s. N. Rose Developers Pvt. Ltd is a proposed residential project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. It plans buildings of up to 57 floors on 9.5 acres. Its stated project cost is ₹425 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 20 Feb 2025).

See it on the live map All projects in Mumbai Suburban

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Amendment in Environmental Clearance for Slum Rehabilitation Scheme Jankalyan CHS at CTS no. 1625 (pt), 1648(pt), 1653(pt), 1654(pt), 1657(pt) and 1663B (pt) village Dahisar, Shanti Nagar Zopadapatti, Dongari S.V road Dahisar Mumbai proposed by M/s. N. Rose Developers Pvt. Ltd is a proposed residential project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. It plans buildings of up to 57 floors on 9.5 acres.

Who is building it?

The applicant is M/S. N. Rose Developers PVT. LTD.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 20 Feb 2025), as of 27 Nov 2026.

Where is it?

In Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra.

How big is it?

It has a stated cost of ₹425 crore and a site of 9.5 acres.

When was it filed?

The application was filed on 5 Feb 2025.

One of 3 filings for this project. The project's main page, with every filing and where each stands: Amendment in Environmental Clearance for Slum Rehabilitation Scheme Jankalyan CHS at CTS…

Project details

StatusCleared for impact study
Status since20 Feb 2025
Application filed5 Feb 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorBuildings & townships
ApplicantM/S. N. Rose Developers PVT. LTD
UseResidential
Floors (tallest)57
Basements2
Land area9.5 acres (3.8 ha)
Built-up area4,16,382 m² (44,81,894 sq ft)
Project cost₹425 crore
Village / localityGreater Mumbai (M Corp.)
Taluk / tehsilMumbai Suburban
DistrictMumbai Suburban
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-07043

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Amendment filed 4 Apr 2026Environmental approval granted9.5 acres₹425 crore
Expansion filed 3 Nov 2025Environmental approval granted9.5 acres₹425 crore
Early planning filed 5 Feb 2025 (this page)Cleared for impact study9.5 acres₹425 crore

In context

1,858 applications in Mumbai Suburban since January 2022 are in the same category (Buildings & townships): 1,230 approved, 196 filed or under review, and 432 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 9.5 acres, this one is larger than 85% of them.

270 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Close to Adani’s ₹7,514 Crore Dharavi Redevelopment: 47,076 Homes Planned in Major Mumbai Project (14.4 km away).

Other projects nearby

All 3 N. Rose Developers projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.