Project details
| Official title | Environmental Clearance for Stone Quarry Project (Area 1.00 Ha) (Private Land) with production capacity 5,000 Brass/Annum at Khasra No. 179 (Part) Village- Dhekari, Taluka- Tuljapur, District- Dharashiv, Maharashtra by Shri. Dnyaneshwar Babasaheb Kadam Malba |
|---|---|
| Status | Environmental approval granted |
| Status since | 24 Oct 2025 |
| Application filed | 6 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Dnyaneshwar Babasaheb Kadam Malba |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹35 lakh |
| Village / locality | Dhekri |
| Taluk / tehsil | Tuljapur |
| District | Osmanabad |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-07381 |
In context
103 applications in Osmanabad since January 2022 are in the same category (Mining): 89 approved, 0 filed or under review, and 14 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 2.5 acres, this one is smaller than 100% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Dhekri, Tuljapur, Osmanabad, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Shri. Santosh Narayanrao Salunke – Basalt Stone Quarry lease over an area of… — environmental approval granted, 2.9 km away
- Shri. Vaibhav Sajjanrao Salunke - Basalt Stone Quarry lease over an area of… — environmental approval granted, 2.9 km away
- Bori (Stone & Murrum) Quarry Project Shri. Santosh Narayan Salunke — environmental approval granted, 3.6 km away
- Shri. Dinesh Ganapatrao Korade- Stone Quarry lease over an area of 1.0 Ha — environmental approval granted, 7.4 km away
- Shri. Ramesh Ganapatrao Korade- Stone Quarry lease over an area of 1.0 Ha — environmental approval granted, 7.6 km away
- STONE QUARRY OF SHRI. VILAS RAJARAM KURHADE, SHRI. VIJAY RAJARAM KURHADE,… — environmental approval granted, 7.8 km away
- Greenfield Railway line between Solapur -Tuljapur-Osmanabad (Total Length of… — withdrawn, 8.9 km away
- Shri. Ashok Rajaram Kurhade of Stone Quarry (M L Area 1.0 ha) Production… — environmental approval granted, 10.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.